Laserfiche WebLink
D. Alternate construction for new underground storage tanks containing motor vehicles fuel CSection 2633). <br /> (1) Monitoring and response oLan (Section 26341. <br /> (2) Underground storage tank composed of.... <br /> (a') Fiberglass reinforced plastic. <br /> (b) CathodicaLly protected steel. <br /> X (c) Steel clad with fiberglass reinforced plastic. <br /> (d) Other material that complies with section 2631 and 2632. <br /> (3) Floor of leak interception and detection system constructed on a firm base and sloped to a <br /> collection sump (use of membrane liners comply with section 2631 (d) (6) requirements.) <br /> (4) Access casings installed in the collection sump of the secondary containment system with <br /> backfill in the interstitial space. The access casing shall meet all of the following: <br /> Designed and installed to allow the liquid to flow into the casing. <br /> Sized to allow removal of collected liquid and able to withstand all anticipated applied <br /> stresses. <br /> Constructed of material that will not be structurally weakened- <br /> Screened along entire vertical zone of permeable material. <br /> Capable of preventing leakage of any hazardous substance from the casing. <br /> Extend to the ground surface and covered with a locked waterproof cap. <br /> Capable of meeting S.J. Co. PHS-EHO Well Standards. <br /> Leak interception and detection system shall prevent the leaked hazardous substance from <br /> entering ground water. <br /> 14. INTERSTITIAL SPACE MONITORING <br /> A. Visual monitoring (Section 2632 (c) (1)] <br /> (a) Exterior surface and floor beneath tank monitored by direct viewing <br /> (b) Daily visual inspections <br /> (c) Liquid level in tank to be recorded at time of inspection <br /> (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized release <br /> has occurred. <br /> B. Mechanical or electronic monitoring (Section 2632 (c) (2)] <br /> (a) Continuous monitoring system connected to an audible and visu L alarm system. <br /> Monitoring equipment to be installed <br /> Manufacturer: `.'C -11,6aeee) Gm � <br /> Model Number: coo <br /> Sensor Type: Vapor Liquid _ Bath. <br /> Sensor/Panel specifications. <br /> _ Locatioa(s) fa/' sensors: <br /> Tank: /7/)I'1(w11,S Piping: ,Sum, <br /> Dispenser- ,Sym 0'0 <br /> C. Monitoring and response plan submitted (Section 2632 (d) (1) & (2)]. <br /> 15. Any special accessories, fittings, coatings, or Linings not inherent within the initial design of the 1a tank or <br /> double-wall UST. (Section 2631 (b)] <br /> A. Approved by a nationally recognized independent testing organization. <br /> a. Demonstration of integrity with the primary and/or secondary containment. <br /> 6 <br />