My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506708
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 1:28:49 PM
Creation date
11/5/2018 10:20:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0506708
PE
2361
FACILITY_ID
FA0007590
FACILITY_NAME
OLYMPIAN FUELING NETWORK
STREET_NUMBER
1789
STREET_NAME
FRESNO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1789 FRESNO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRESNO\1789\PR0506708\INSTALL 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Piping (cross-section T' iagram, including connections to tank and dis sers)- <br /> (A) vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (B) or (C)], or <br /> Provide positive shut off of flow to the tank.at no more than 95 X [Section 2635 (b)(2)(03, or <br /> (B) Vapor recovery piping designed so it cannot contain Liquid phase product, or <br /> (C) Suction piping (below grade piping operates at Less than atmospheric pressure) (Section 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pups installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) x Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> VPrimary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of:_.�'/_secondary pipe_Vault or <br /> _lined trench to be sloped to a collection sup at the Low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.- - <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stared. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> XAutomatic Line leak detectors will be installed on pressurized piping <br /> Manufacturer: Rr4 SQc IZ e}' model: Fk—Z <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual Line tightness test will not be required if the continuous monitor shuts dawn the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21- Plan review and operating permit fees paid. <br /> 22. what is the approximate depth to ground water: 3 <br /> (include source of information - borehole Logs, monitoring well data, water <br /> studies, etc.) <br /> 23. Total number of tanks an site after installation: — S <br /> 24. Courcy/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a Leaking UST system it is your <br /> responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHO Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner ator rmyust at cknolledge this respo <br /> onnsibility for workplan submittal by signature and date below. <br /> .�,,,L/ Titlee)//cNFz<s a Ink)c Date <br /> CONDITIONS OF APPROVAL: <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.