My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2300 - Underground Storage Tank Program
>
PR0500608
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2021 10:24:03 PM
Creation date
11/5/2018 10:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0500608
PE
2381
FACILITY_ID
FA0009965
FACILITY_NAME
PLAY AND PARK
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
163-06-014
CURRENT_STATUS
02
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRESNO\1817\PR0500608\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/7/2013 8:00:00 AM
QuestysRecordID
149005
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br /> // \1STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR ANK SYSTEM. <br /> MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CH OF INFORMATION ❑ 7 PERMANENTLY CLO <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 6 AMENDED PERMIT ❑ e TE PORARV TANK CLOSURE ❑ B TANK REMO 0 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: l7 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.9 B. MANUFACTURED BV: <br /> C. DATE INSTAL6.E0(MOfOAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> ILTANKRLWENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> Ta REGULAR 3 DIESEL <br /> A. 1 MOTOR VE HK;LE FUEL 4 OIL B. G ❑ UNLEADED ❑ S AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ SO EMPTY /IPRODUCT ❑ 1OPREMIUM a GASAHOL ❑ 7 METHANOL <br /> UNLEADED 9JET <br /> OTHERFUEL <br /> F-1E:] (DESCRIBE IN ITEM D.BELOM <br /> 3 CHEMICAL PRODUCT 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 9 <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STOPED C.A.S.0: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C.AND ALL THAT APPLIES IN BOX <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> (� SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 6 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ S POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ % UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ S EPDXY LINING ❑ A PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS UNIXi ❑ S UNLINED ❑ 96 UNKNOWN 99 OTHER <br /> LINING ❑ <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL 7 YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 96 UN104OWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> . SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> (l l B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U • FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 9 CONCRETE A U 7 STEEL W/COATING A U B 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ O LpNR IAL <br /> ❑ OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING❑ 6 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ e TANK TESTING ❑ 7 INTERSTITIALMONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MOIOAYNR) 2.ESTIMATED QUANTITY OF A WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL T YES ❑ NO❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED&a TIRE <br /> LOCAL AGENCY USE ONLY THE STATE LD.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> �� <br /> COU�NTY 9 JURISDICTION A FACILITY I TANK 9 <br /> STATE LD. e a l l/ 1 ,01d D1 al 010 loll <br /> PERMITNUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> FORM B (9.90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORO9MM <br /> V <br />
The URL can be used to link to this page
Your browser does not support the video tag.