My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 3:22:51 PM
Creation date
11/5/2018 10:21:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for GEMCO RIPON TRUCK PLAZA INC as of March06, <br /> 2017. <br /> Open violations from March 18, 2015 inspection <br /> Violation #715 -Failed to regularly test liquid level sensing devices to ensure proper operation. <br /> Procedures and frequency of testing for these devices were not addressed in the Spill Prevention, Control, and <br /> Countermeasure (SPCC) plan. While onsite the existing liquid level sensors connected to the onsite Veeder Root <br /> system were tested along with the liquid sensors connected to the onsite underground storage tank(UST) system. <br /> Liquid level sensing devices must be installed in accordance with CFR 112.8 and shall be regularly tested to ensure <br /> proper operation. Immediately revise the SPCC plan to include appropriate testing procedures for these devises <br /> and conduct all necessary testing (as required), or provide equivalence as allowed by CFR 112.7(a)(2). <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.