Laserfiche WebLink
SWkCB, January 2002 Page of <br /> 5. SLCQNDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer Industry Standard Professional Engineer <br /> Other ecz <br /> Test Method Used: ressure Vacuum Hydrostatic <br /> O er Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# S Piping Run# (P Piping Run# 7 Piping Run# <br /> Piping Material: EL <br /> Piping Manufacturer: sm" <br /> Piping Diameter: sxzCU/` X /� , X?— <br /> Length <br /> 2Length of Piping Run: 1 t{ -eilff� Zid GC SeT -OEC t q ft--Ef <br /> Product Stored: i '---)t'ES�l t'E:S <br /> Method and location of EAA <br /> piping-run isolation: C6VA 4Cjo -'S <br /> Wait time between applyingM k41 t,' <br /> pressure,'vacuum/water and yyI,N � <br /> starting test: Iz/3a o2 12 9 e/6L a JAZ 1/a 3 <br /> [Final <br /> est Start Time: f:� �4 ', �� � t ° �� 16 <br /> itial Reading(Ra): psi <br /> st End Time: j 11' 2-S7 �Z SC =?1) <br /> Reading(RF): S psi 5 Sl 5 t <br /> Test Duration: Hwiz 1 Rove "Z�U r, 106%j R <br /> Change in Reading(RF-Rj): W D 146 T.lD W f.tD N wo tj.a E <br /> Pass/Fail Threshold or <br /> Criteria: 5pS 1 )Sf S <br /> Test Result: iff-Pass ©Fait 4�1�ass ❑Fail B Pass ❑Fait Pass Q Fain <br /> Comments--(include information on repairs made prior to testing, and recommended follow-u for failed tests) <br /> RK,KVQ <br /> KV0Goes P.OA ?-'131 SvrAp to + t iSlvlti-4 -6 Pi suwx iwj E <br /> Wi( (t ► { <br />