My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_1998 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 3:20:17 PM
Creation date
11/5/2018 10:22:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2004
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0231604\COMPLIANCE INFO 1998 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1998 - 2004
QuestysRecordDate
11/29/2017 11:11:14 PM
QuestysRecordID
3738035
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 `' <br /> Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer Industry Standard Professional Engineer <br /> Other(S ecify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> er(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 11S Piping Run# Piping Run# 1-15-- Piping Run# <br /> Piping Material- -j �ts� lSS <br /> Piping Manufacturer: <br /> Piping Diameter: t_{-)(3 <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location ofF (,erv►Mn <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and S►' f Flitif��s <br /> starting test: <br /> Test Start Time: 10 ;Z3 1z, q0 1-3 5 <br /> Initial Reading(Rj): <br /> Test End Time: t#b <br /> Final Reading(RF): psi L- s i' 5 i <br /> Test Duration: ttvuk j VizutC },�VvK <br /> Change in Reading(RF-Rj): 1,jo"e N <br /> Pass/Fail Threshold or } 3 1 �c,, <br /> Criteria: 5 <br /> Test Result: ass ❑Fail ass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommender!follow-u or failed tests) <br /> P'2t 994 i3 0,fCS nil -'-1",4 6 -b "Ot to <br /> M'''ys pipe IE'Utd &,P( At CE iP ANz6:1a� 6 *SAi A: 5�Ca i <br /> l �DO W SCS i'u +°l <br /> P Ky NC lES -C iC A of-�S E►avt lK 1'l A VW( 1Z +0 rs fn+tel <br /> "PF KUN <br /> 5.1n�' E -�K bdci-t' C1vtr+n c�til• <br />
The URL can be used to link to this page
Your browser does not support the video tag.