My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000155
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ASHLEY
>
7644
>
3500 - Local Oversight Program
>
PR0543394
>
ARCHIVED REPORTS XR0000155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 4:11:54 AM
Creation date
11/5/2018 10:27:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000155
RECORD_ID
PR0543394
PE
3528
FACILITY_ID
FA0003967
FACILITY_NAME
AT&T California - UE132
STREET_NUMBER
7644
Direction
N
STREET_NAME
ASHLEY
STREET_TYPE
Ln
City
Stockton
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
7644 N Ashley Ln
P_LOCATION
99
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SACRAMENTO REVIEW DRAFT <br /> Addedum Letter to Mr. Harlan Knoll <br /> August 31, 1990 <br /> Page 6 <br /> analytical data in sufficient time to be used during the construction of <br /> the vapor extraction wells. The laboratory will be California <br /> Department of Health Services (DHS) certified. Each soil sample <br /> selected for analyses will be analyzed for TPH-d by DHS Methodology and <br /> BTEX by EPA Method 8020. Samples for bacteria population count will be <br /> analyzed by a laboratory not yet selected. <br /> Up to 20 vapor samples will be collected during the operation of the <br /> pilot study. All of the samples will be submitted under chain of <br /> custody to Trace Analysis Laboratory in Hayward, California. Initially <br /> each sample will be analyzed for TPH-d by Trace Analysis Laboratory <br /> Method and for TPH as gasoline (TPH-g) and BTEX by Modified Method CA- <br /> ADDL004. The sampling schedule is being developed at this time. <br /> Schedule for Pilot Study <br /> It is anticipated that the wells will be installed by October 1, <br /> 1990. By October 14, 1990, the SVX system should be ready for <br /> operation. The pilot study is expected to run approximately 120 days and <br /> will be completed on or about February 14, 1991 . A report of the pilot <br /> study's findings will be completed within 45 days of the study's <br /> completion. Included in the pilot study report will be an evaluation of <br /> what residual levels of contamination will remain after completion of a <br /> full scale remedial program. A Health and Safety Plan will be submitted <br /> as part of the final draft of the Addendum to the Remediation Plan. <br /> We look forward to our meeting in your office next Tuesday, September <br /> 4, 1990. Should you have any questions please do not hesitate to <br /> contact either of us at any time. <br /> Sincerely yours, <br /> final to be signed)_ _ _ (final to be signed) <br /> James R. Frantes, R.P.G 4534 K. Lyle Dokken <br /> Manager, Environmental Hydrogeologist <br /> Geoscience Programs <br /> cc: Michael Della Rocco, Pacific Bell <br /> Steve K. Wat, Pacific Bell <br />
The URL can be used to link to this page
Your browser does not support the video tag.