Laserfiche WebLink
0 <br />ility/Site _--- <br />V DE POL ENTERPRISES INC <br />E FRONTAGE RD <br />IN, CA 95366 <br />mittal Status <br />nitted on 12/18/2014 by David Robinson of Van De Pal Enterprises, Inc (Stockton) <br />0 <br />[ERS ID <br />10181513 <br />UST Tank N <br />TA0506341 <br />agility Information <br />—. <br />r <br />Equipment Testing Maintenance ] <br />_.-10 <br />-- _ —l <br />ary Containment System Monitor Panel Manufacturer <br />Leah Sensor Manufacturer <br />and Prin entive <br />onitoring Locations <br />AN DE POL ENTERPRISES INC <br />Leak Sensor Model P <br />,Monitoring Equipment Serviced <br />I itv plot Plan Subm tted <br />Ir <br />16 E FRONTAGE RD <br />Annually <br />Plan Previously Submitted '. <br />RIPON, CA 95366 <br />Monitoring is Performed Using the Following Method(s). <br />_.... _.......----- ... ........ . ......... ....... <br />Continuous Electronic Tank Monitoring <br />ary Containment System Monitor Panel Manufacturer <br />Leah Sensor Manufacturer <br />Veeder Root <br />Veeder Root <br />Monitor Panel Model <br />Leak Sensor Model P <br />TLS 350 <br />420 <br />Automatic Tank Gauging <br />ITG Panel Manufacturer In -Tank Probe Manufacturer Leak Test Frequency Programmed Tank Tests <br />ATG Model g In -tank Probe Model <br />Monthly Statistical Inventory Reconciliation <br />Weekly Manual Tank Gauge <br />Gauging Test Period <br />Other Monitoring <br />Printed on 12/29/2014 8:11 AM <br />Tank Integrity Testing <br />Tank Integrity Testing Frequency <br />