Laserfiche WebLink
Ah <br />Ah <br />UNIFIED PROGRAM CONSOLIDATED FORMW <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VL UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 4o-54 <br />V L CONTINUOUS ELECTRONIC MONITORING 112. FLOAT AND CHAIN ASSEMBLY 113. ELECTRONIC STAND-ALONE 4fl 54b <br />❑ 4. NO DISPENSERS ❑ 99. OT R S i ): <br />PANEL MANUFACTURER: 490'33 <br />MODEL!!: 49o-56. <br />LEAK SENSOR MANUFACTURER: 490'57 <br />MODEL g(S): 490.59 <br />DETECTION OF A LEAK INTO THE UDC 11UGGERS AUDIBLE AND VISUAL ALARMS R a Y S ❑ b. NO 490'59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN E. a. YES ❑ b. NO 4040. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Q] a. YES ❑ It. NO 490'61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER Cr a. YES ❑ b. NO 4o-62 <br />L UDC CONSTRUCTION IS ❑ L SINGLE -WALLED 2. DOUBLE -WALLED 490' <br />IF DOUBLE WALLED: 490444 <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1. LIQUID 2. PRESSURE 0 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS [3a -YES ❑ b. NO 490446 <br />VII. PERIODIC SYSTEM TESTING <br />1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49045 <br />LEAK DETECTIONfflM MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />❑ 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49446 <br />❑ 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />Alarm logs 49 sa Q Visual Inspection Records 40.69b ❑ Tank integrity testing results 40.6& <br />❑ SIR testing results (and supporting documentation records). 49 d ❑ Tank gauging results (and supporting documentation records). 490.69. <br />❑ ATG Testing results (and supporting documentation records). 4o49r ❑ Corrosion Protection 60 -day logs 4so.499 <br />Equipment maintenance and calibration records. 490.69h <br />IX. TRAINING <br />❑ Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49o.69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490496 <br />OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 49 % <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49a69d <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW 490497 <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCIIAATION" 4s0.69r <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490499 <br />❑ OTHER (Specify): M691. M691 <br />IQ This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility, employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />• Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />➢ The facility employee's role with regard to spills and overfills w specified in the UST Response Plan <br />• Names of contact persons) for emergencies and monitoring alarms. 4so.7o <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide add' ' nal comments here er.indicaw how manyes with additinal info on on specific monitoring procedures are attached m di plan. 4o -7i <br />©v Ow—i�eJetJy30 A�C� 92,t©4- vkSvpk\ ) AcoNIS pv� (VO <br />QNAc,tq <br />)i. PERSONNEL RESPONSUHLITIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following on s) are res1�o ble r performing the monitoring and equipment mammitaNa <br />NAME i \ 49 n TITLE V IGQ 49o-» <br />NAME 49x74 TITLE 49x75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I =tify,thqjhe inf9rNation <br />provided herein is true and accttmte to the best of my knowledge. <br />APPLICANTS <br />490.76 <br />DATE: 49077 <br />_ <br />12-- ZZ -o1 <br />n / 3. Amho _ R r iv f x <br />APPLICANT NAME (print): 490.79 <br />APPLICANT TITLE: 49049 <br />UPCF UST -D (12/2007) 3/4 <br />