Laserfiche WebLink
VAN DE POL Fax:2094661910 Feb 1 2010 9:18 P.03 <br />�+. rva•aa--aa ;auC MHD • �005/00E <br />UN -0328-1/3 i www,neWOCLorg Rev. 00/02/09 <br />RJtvulsLluxuuND STORAGE TANK <br />RESPONSE PLAN - PAGE 1 <br />TYPE OF ACTION ❑ LNEW pL <br />One tbnn Per fadli <br />Q 2. CHAN060F INFORMATION <br />lel. <br />I. FACILITY INFORMATION <br />FAclury ID a (.tga„cy user 0,0) <br />BUST SS NAME Satin as pACB1TY <br />— t. <br />pM� '- <br />BUSINESS S ADD <br />l <br />ire• B ,NESS SITE CITY 104, <br />a <br />,IQ <br />. SPILL CONTROL AND CLEANUP METIIO S <br />Tins plan -Id sas unauthorizedmlgaes <br />TSBusinessPlan (HMBu). <br />(14 <br />from UST sysceus and aupplettlenu§ the emcrgemy response plaits and pmeeftes in the likility's Plazardmta Materials <br />>' if sale to do so, facility Permit! will <br />remaining hazardous material from the <br />tee Immediate hneasums to control or slop ally rutease (e,g., activate <br />ST system. pump sltutbf4 eta.) mrd, if necessary, safety remove <br />> Any release to secondary eontaimnent <br />contain the bazsnkim Inatsalal, but hat <br />will be pumped or otherwise ramoved within a it= cer aialeat with die ability of the secondary eomahmxnt system t0 <br />ter than 30 calendar days, or sooner if required by the local agency. Rxoveml <br />Sir their intended use, will be managed <br />hazardous materials, unless still suRablo <br />Itazardms waste. <br />> Absorbent material will be send to emlam <br />effective w which is no longer itumtled <br />and clean up manageable spills of hazardous materials. Absorbent material which las become too eatumtad to be <br />for use will be <br />it is Itondtaaardons. Used absorbem <br />managed as haa�ardous waste unless a waste delcsmination N accordance with u CCR §66362.11 firuls tat <br />1 llimh Cat <br />tmai, reassure or wast, will bo stared in a propcdy labeled and @ade ll Waste <br />appropriatety. <br />material shall be <br />of <br />> Facility personnel will det4mdne what <br />manufindsf h if the Watt/ i9 Collminatad, <br />mer my water removed door seciandary emblinment systems, or Arose dtaan•up aotiviry, tun bean in o0ntact with §try <br />it will be managed as haaardona waste unless a hazardous <br />§6626hlntard11 <br />�662ti2.11 funs that it is nos -b n"'Cleu <br />necessarily display rainbow eolam. We <br />waste determination in iecordance with 22 CCR <br />. If the water Inas a pcilyleum sheen (I.e., rainbow cobra). It a eontaninakd. A Wick Boating peunleum layer miry seer <br />(hazardous orn ondssardous) from sumps, spilleonkinets, etc, be disposed <br />> We will eeview secondary containments <br />will tat to storm water systems. <br />toms for possible deterioration if any of the tbIlming conditions Occur: <br />I. HazaMouq nudedel in caatact wills <br />2. 9ecatdaryemttahunvnt is phone to <br />INlda[y contaminant is not compatible with the material used far secondary wntsinrnpu; <br />mage tYOm any equipment used to remove hazardous <br />3. Heaerdous material, otter Wan the <br />or clean material waw in axon <br />t52 daffy Cemllintrrpnt: <br />producvwaat stored in We phihairy Mntaittnant system, is plead inside secondary wntainmmt 1A <br />related product/waste, and the <br />KCaf err neutralize <br />n44tfial or tesuiting material l3Out suoltacombhratien istalcosrylatibly with secondary rontainmenL <br />III. <br />SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill eon <br />equipments inapeod az least monthly, and <br />t and dcm-up NuiPmcat kept parnanrntly on-site is listed in the tgcility's Huardous Materials Ba§ilross Plan rhis <br />pair use, supplim are repkniehedas needed. DdP tiva equipnw it ig repaimd <br />or mplaOed as ttocessmy, <br />E UIPMEN"1'N01'PERMANENTLYO <br />-SIT BUT AVAILABLE FOR USE IP NEEDED: Cot em only licabls <br />EQUIPMENT <br />LOCATION AVAILABILITX <br />Kim P30. RM. <br />Rtl. Mi. wi. <br />812. Rea hue <br />Rha 01, Rah. <br />Rea nu.. <br />RIs. M5. MI <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSONS) ISIARE I <br />ESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER TH18 RESPONSE PLAN: <br />NAMB <br />1 <br />u <br />TITLE <br />NAME <br />4 �• <br />aRh• <br />TITLEi a5i. <br />z� <br />NAME <br />Rae. <br />TITLE <br />NAME <br />R41. <br />TITLE as . <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIB <br />UNALTHORIZED RELEASE, STEPS TO VERIFYTHE RELEASE WILL SE MADE AS FOLLOWS: <br />❑1.ADDITIONAL SYSTaMT13TM'Olt DAT <br />COLUCPION ❑2,INSPECTION eYQUALIFIED PERSONS Ell. RE.CALIORATIONOFEQUIPMLNT Rea <br />❑ 99. OTHEt(SNOY): <br />R61. <br />UN -0328-1/3 i www,neWOCLorg Rev. 00/02/09 <br />