Laserfiche WebLink
0 <br />ed on 12/18/2014 by Dovrd Robinson of Van De Pol Enterprises, Inc Istockton) <br />acility Information <br />/AN DE POL ENTERPRISES INC <br />116 E FRONTAGE RD <br />UPON, CA 95366 <br />rank Description <br />rank on <br />Date UST System Installed <br />Tank Configuration <br />rA0147002 <br />AN DE POL ENTERPRISES INC <br />CERS ID <br />16 E FRONTAGE RD <br />10181$13 <br />RIPON, CA 95366 <br />OOR <br />Submittal Status <br />Submitt <br />1 <br />ed on 12/18/2014 by Dovrd Robinson of Van De Pol Enterprises, Inc Istockton) <br />acility Information <br />/AN DE POL ENTERPRISES INC <br />116 E FRONTAGE RD <br />UPON, CA 95366 <br />rank Description <br />rank on <br />Date UST System Installed <br />Tank Configuration <br />rA0147002 <br />)ouble Wall <br />A Stand-alone Tank <br />rank Manufacturer <br />Date Existing U51' Discovered <br />Number of Compartments in the Unit <br />OOR <br />None <br />1 <br />Wank Capacity In Gallons <br />Date UST Permanently Closed <br />Additional Description <br />12000 <br />Vapor Recovery Secondary Containment <br />3/10/00 CHNG PE FR 2380 TO 2360 PER <br />res Audible/Visual Alarms <br />Fill Tube Shut -OH Valve <br />AY <br />rank Use and. Contents <br />'ank Use Tan encs <br />Aotor Vehicle Fueling (Diesel <br />Oth etroleum Contents <br />Other Non -Petroleum Contents <br />rank Construction <br />type of Tank <br />Primary Containment <br />)ouble Wall <br />Piping Construction <br />- P6mary Containment <br />Fiberglass <br />?rimary Containment <br />Piping/Turbine Containment Sump <br />Single -walled <br />Secondary Containment <br />)that <br />None <br />Other <br />Leel tank clad with fiberglass <br />steel tank clad with fiberglass <br />N¢rfilf Protection <br />Vapor Recovery Secondary Containment <br />Riser Pipe secondary Containment <br />res Audible/Visual Alarms <br />Fill Tube Shut -OH Valve <br />Bah Float <br />Exempt <br />Vent, Vapor Recovery (VR) and Riser/ Fill Pipe Piping Construction <br />Primary Containment <br />/ Waste <br />struCHon <br />,ailed <br />Piping Construction <br />- P6mary Containment <br />Fiberglass <br />Secondary Containment <br />Fiberglass <br />Piping/Turbine Containment Sump <br />Single -walled <br />Vent, Vapor Recovery (VR) and Riser/ Fill Pipe Piping Construction <br />Primary Containment <br />Vapor Recovery Priority Containment <br />RiserPipe Primary Containment <br />Vent Piping Transition Sumps <br />-fiberglass <br />Fiberglass <br />Steel <br />None <br />Fill Components Installed <br />secondary Containment <br />Vapor Recovery Secondary Containment <br />Riser Pipe secondary Containment <br />I�Yes Spill Bucket <br />'fiberglass <br />I Fiberglass <br />Steel <br />Yes striker Plate/Bottom Protector <br />Yes Containment Sump <br />Under Dispenser Containment (UDC) orrosion Protection <br />�onon Type -- Co t ucdon Mater al <br />-- — Anode <br />Ingle -walled Steel Impressed Current <br />t <br />IBS <br />ppal.. <br />Nam. <br />pplicanit n[Name Applicant Title <br />Date Certified <br />DAVID ATWATER GENERAL MANAGER <br />1/8/2014 <br />- <br />Printed on 12/29/2014 8:11 AM <br />