My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAIGHT
>
6426
>
2300 - Underground Storage Tank Program
>
PR0527888
>
REMOVAL_2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 9:38:16 AM
Creation date
11/5/2018 11:08:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2008
RECORD_ID
PR0527888
PE
2361
FACILITY_ID
FA0018908
FACILITY_NAME
HONDO COMPANY LLC
STREET_NUMBER
6426
STREET_NAME
HAIGHT
STREET_TYPE
RD
City
LODI
Zip
95242
APN
06115038
CURRENT_STATUS
02
SITE_LOCATION
6426 HAIGHT RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAIGHT\6426\PR0527888\COMPLIANCE INFO 2008.PDF
QuestysFileName
COMPLIANCE INFO 2008
QuestysRecordDate
8/8/2017 11:17:15 PM
QuestysRecordID
3563134
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Tank/Piping Hauler: <br />Name West Coast Equipment <br />Address 1221 S Tegner Rd CityTurlock Zip 95380 <br />Phone No.( 209 ) 668-9378 <br />Hauler Registration ti (if hauled as hazardous) <br />C. Tank/Piping Disposal Site: <br />Name West Coast Equipment <br />Address 1712 S Walnut Road City Turlock Zip 95380 <br />Phone No.( 209 ) 668-9378 <br />EPA ID# (if transported to a permitted TSD facility) <br />9. Is the sampling firm an independent third party from the contractor? YES ❑r NO <br />9a. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />A decontaminated Hand auger will be used to drill a hole to approximately 6 feet in deptl <br />and undisturbed soil samt)les will be collected and placed in brass tubes and placed on ic( <br />for transportation to argon Lans <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />The 3 inch diameter, six foot deer hale will be backfilled with surface clean soil material <br />11, Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />No tank pit is currently located onsite, the augered material will be placed in a 5 gallon bucket <br />b) What will be the final destination of the excavated stockpile? <br />Based on the analytical results, the soil will either be left onsite or taken to forward landfill <br />c) Contaminated Soil Hazardous Waste Hauler: <br />Name Asbury Environmental Hauler Registration # 0015 <br />Address 7300 Chevron Way City Dixon Zip 95620 <br />Phone No. ( 800 ) 727-2879 <br />12. What is the depth to groundwater? Approximately 70 feet bgs <br />13. <br />Describe the source of information: <br />Are there any water wells on this parcel or adjacent properties? <br />EH 23 046 (Revised 8/3107) 5 <br />YES (] NO ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.