Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FOMW <br />UNDERGROUNDSTORAGETANK <br />MONITORING PLAN - (Pae 1 of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN E 2. CHANGE OF INFORMATION <br />4961 <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490-2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />L FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) I I I I I I I I II <br />BUSINESS NAME (Same as FACILITY NAME) COSTCO WHOLESALE GAS STATION #38 <br />3. <br />BUSINESS SITE ADDRESS 1616 EAST HAMMER LANE 103 <br />1 cITY STOCKTON <br />'00 <br />H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or normally, whichever is more frequent, and that such work must be performed by qualified personnel. <br />(23 CCR §2632, 2634, 2638, 264 <br />MONITORING EQUIPMENT IS SERVICED E 1. ANNUALLY ❑ 99. OTHER (Specify): <br /><93e <br />III. MONITORING LOCATIONS <br />® 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634)4904 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />4965 <br />VAULTS) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: ❑ a. DRY E b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />4966 <br />PANEL MANUFACTURER: VEEDER ROOT__ 490,-'/' MODEL #:_TLS -350 <br />49x8 <br />LEAK sENsoR MANUFACTURER: VEEDER ROOT 490.9I MODEL #(s): 794380-301 <br />490.10 <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S). (23 CCR §2643) <br />490-11 <br />PANEL MANUFACTURER: 4W12. MODEL #: <br />------- <br />490,13 <br />-- 490-14' MODEL #(S): <br />-- IN -TANK PROBE MANUFACTURER: <br />490,15 <br />__- <br />--- LEAK TEST FREQUENCY: ❑ & CONTINUOUS - -- ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490-16 <br />❑ d. MONTHLY El e. OTHER (Specify): <br />4W1/ <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />n9Wo-:9 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490-M <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />49021 <br />490-22 <br />❑ 5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />49623 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />4WN <br />490-0 <br />❑ 99. OTHER (Specify): <br />490-26 <br />49627 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />E 1. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />4WU <br />VISUAL ALARMS. (23 CCR §2636) <br />SECONDARY CONTAINMENT IS: Ea. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490-25 <br />PANEL MANUFACTURER: VEEDER ROOT 690.30 <br />I_MODEL#: TLS -350 <br />49WI <br />49°-32 <br />MODEL#(s): 857080-112, <br />49x33 <br />LEAK SENSOR MANUFACTURER: VEEDER ROOT <br />794380-352 (REG TI FILL) <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. E a. YES ❑ b. NO <br />49x34 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a. YES ❑ b. NO <br />49035 <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 gph. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED (23 CCR §26 6 <br />4W36 <br />MLLD MANUFACTURER(S): 4963 MODEL#(S): <br />49038 <br />E 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />49639 <br />ELLD MANUFACTURER(S) VEEDER ROOT 49°-4°� MODEL #(S): PLLD -_ <br />490,41 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />49042 <br />EII.D DETECTION OFA PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a. YES ❑ b. NO <br />49°-43 <br />EIIA FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. E a. YES ❑ b. NO <br />49 <br />❑ 4. PIPE INTEGRITY TESTING 4045 <br />TEST FREQUENCY ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) 4904649642 <br />❑ 5. VISUAL PIPE MONITORING. <br />49648 <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* <br />49049 <br />•Mowe for mons nng of unbu emmewy n.w. Nel pipwx.nly w HSC §25281.5(1,)(3 <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA [23 CCR §2636(x)(3)]. <br />490-50 <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />49651 <br />❑ 99. OTHER (Specify) <br />40.52 <br />53 <br />Belshire Environmental Services, Inc. <br />