Laserfiche WebLink
a <br />a BCE810199 Tank2 <br />UNIFIED PROGRAM CONSOLIDATED FORM -VAP C <br />UNDERGROUND STORAGE TANK Q If (�L <br />//'j <br />OPERATING PERMIT APPLICATION - TANK INFORMATION (One to=m per USTI <br />TYPF. OF ACTION (Check one item only. For an UST permanent closure or renwval, complete only this section and Sections I, II, III, IV. and IX below) 4'o <br />❑ L NEW PERMIT ❑ 3. RENEWAL PERMIT 9 5. CIIAN6E OF INFORMATION <br />6. TEMPORARY UST CLOSURE 0 7. UST PERMANENT CLOSURE ON SITE Ej 8. UST REMOVAL <br />DATE ITS "r PERMANEN'T'LY CLOSED- Ji1u DAT[ FXISTIN(. I. ti t DISCOVERED: <br />I. FAC'II-FlY INFORMATION <br />FACILITY ID k (dgem i LCre Onh'i <br />_ <br />_ <br />7 <br />C-' <br />t <br />BUSINESS NAME (Same as FACILITY NAME or DBA -Doing Business As) <br />Costco Gasoline (Loc. No. 38) <br />BUSINESS SI I I ADDRESS " <br />city 1° <br />1616 E. Hammer Lane <br />Stockton <br />11. TANK DESCRIPTION <br />IA\K IU .�uq OSISL 4U TANK MANI II '\(' rl' IIH:It 411 TANK CONFIGURATION: THIS 1 nil: I> <br />I , G1k+C1 M 1. A STAND-ALONP. TANK <br />2 / Containment Solutions 132.ONE IN.A COMPARTMENTED IINI'1'. <br />DATE I'SAT SYSI"L"M INSTALLED 41 1:ANK C'APACII"Y IN GALLON> 4'6 NUMBER OP COMPARTMI:NI'S l\ n II 1 - <br />March 2004 20,000 1 <br />Ill. TANK USE AND CONTENTS <br />'TANK USE 01a M0'101tVE'HIC'LEFUFLINU ❑ Ib MARINA FI TI NG ❑ Ic AVIATION FUELING 439 <br />0 3. CHEMICAL PRODUCT STORAGE ❑ 4. HAZARDOUS WASTE. p9dmo us.,doa1 ❑ 5. EMERGENCY GENERATOR FUEL (HSC 4:52815101 <br />0 6. OTHER GENERATOR FUEL ❑ 95. UNKNOWN ❑ 99.OTHER IS vify): 41% <br />CONTENTS PEI"ROLEUM, IM la. REGULAR UNLEADED ❑ Ir MIHGRADE UNLEADED ❑ Il, PREMIUM UNLEADED 449 <br />0 3. DIESEL ❑ 5. ICT FUEL 0 6. AVIATION GAS <br />❑ N. PETROLEUM BLEND FUEL. ❑ 9. OTHER PETROLEUM S it ): 4an <br />NON-I'FTR01. FUM- 0 T. USED 011 ❑ Bt. FTHANOL <br />El 11. OTHER NON-PLTROLEL'M IS xdfv I: u9n <br />IV. TANK CONSTRUCTION <br />TYPF OF TANK 0 I. SINGLF WALL 2. fX1URLF W'A I.I. ❑ 95. UNKNOWN u# <br />PRIMARY C•ONTAINMEN E ❑ 1.;'PEEL 3. FIBEROLA65 ❑ 6.INTERNAL BLADDER 444 <br />0 1. STEEL 1 INTERNAL LINING ❑ 95. UNKNOWN 0 99. OTHER (S ifvE 444u <br />SECONDARY CONTAINMENT ❑ I. S1'F EL ® 3. FIRFRGLASS 0 fi. I'.%l E.RIOR MFMRRANF LINER ❑ 7, JACKETED 44d <br />❑ 90. NONE ❑ 95. UNKNOWN 99. OTHPR fSaI' ). u5a <br />OVERFILL PREVENTION Um 1. AUIIIBI.F R VISUAL. ALARMS O 2. BALL FLOAT 0 3, FIJI. TURF. SIIUT-OFF VALVE 45' <br />❑ 4. TANK MEETS REQUIREMENTS FOR EXEMPTION FROM OVERFILL PREVENTION EQUIPMENT <br />V. PRODUCT I WASTE PIPING CONSTRUCTION <br />PIPING CONSTRUCTION 0 1.SINGLF.-WALLED N 2. DOUBLE-W'ALLFD 0 99.071 IER 4111 <br />SYSTEM NPL O 1, PRESSURE O 2. GRAVITY O �. ('ORVLNTIONAL SUCTION O 4. SAFE SUCTION 21 tTx #--'W4rmOH 45n <br />PRIMARY CONTAINMENT Cl I. 5TFF1. ❑ a. FIRFRGLASS I] N. ELF.%IRI.F 0 10. KKJlD PLASTIC 4M <br />0 40. NONE ❑ 95. UNKNOWN 0 99.OTHHRIS cif J: 44a <br />SECONDARY CONTAINMENT0 I. STEEL ❑ 4. FIBERGLASS O N. FLEXIBLE 0 10. RIGID PLASTIC 4W1, <br />❑ 'RI. NONE ❑ 95. UNKNOWN ❑ 99. OTHER (SNi. 464. <br />PIPINGIETRBINE CONTAINNt EN I' SUM P TYPE []I.SINGLEWALL 2. DOUBLE WALL 0911 NINE 41'!d <br />VI. VENT, VAPOR RECOVERY (VR) AND RISER / FILL PIPE PIPING CONSTRUCTION <br />VENT PRIMARY C•ONTAINMEN'I' L31. Sl'FEL IN 4, FIRE NGL ASS III RIGID PL AS ITC ❑ 910. NONE n 99 UI HER ISPseifyl 44a <br />JI <br />VEN'I'SECONDARY CONTAINMEN"I" 01 SIEE.L O4. FIBERGLASS O 10 RIGID PLASTIC ❑'NI. NONE ❑'F) 011111 R Speofy) 464f <br />4411 <br />VR PRIMARY CONTAINMENT 0 I. STFFI O 4. FIRFRGLASS 0 10 RIGID PLASTIC 0 'NI. NONE ❑ 10l. OTHER (Specify) 446 <br />4M,I <br />VR SECONDARY CONTAINMENT 0 1. STEEL 1@ 4. FIBERGLASS Ll 10. BRAD PLASTIC M 90. NONE 0 99. OTHER ISpccify) 44h <br />4461 <br />VENT PIPING TRANSITION SI'A1P 71'1'(: 11 1 9NGLE WALL 2.DO413Lf WALL • 90.NONE 44i <br />RISER PRIMARY CONTAINMI.N I 0• I. SIFFI- 4, FIRFRGLASS In. RIIM I'I ASTIC U 90. NONE U99. OTHER (SPccifv) 4641 <br />4W 1 <br />RISER SECONDARY CONTAINM 1: NT D I. STEEL L1 4. FIBERGLASS In. RIGID PLASTIC [111 90. NONE 099. OTI IER (Specifv) 4644 <br />4Wk1 <br />FILL COMPONENTS INSTALLED • I. SPILL BC(' KI'T IN 3. STRIKER PLATF..'BOTTOM PROTF.(TOR • 4. CONTAINMENT SUMP <br />VII. TINDER DISPENSER CONTAINMENT (UDC) <br />C'ONSTRI'( HON TYPE I] L S1\61 I:. w At 1 0 -'. TAH; III.I. %5 m I. 0 3. NO DISPENSERS 0 'III. NONE <br />CONSTRICTI(ISMATERIAL ❑ ESTILL 04.FIBERGL.AIS M III. RIGID PLASTIC 099.OTIIERIS if) 41'146' <br />VII. CORROSION PROTECTION <br />SrEEL COMPONI-NT PRUIE('I ION ❑ ]. SACRIFICIAL ANODE(S) 0 4 IMPRESSED C'URREN'T 6, ISOLATION <br />IX. APPLICANT SIGNATURE <br />C'F.R TIFICA'IION: I certil) tha(this CS"E system is compalihle with the hazardous substance stored and Thal the information provided herein is True, accurate, <br />and in tall coi # lianee nigh Ie'al requirements. <br />APPLICANT SKGNA <br />4m <br />IpIint) <br />APPLICANT T]TL <br />David H Ra er <br />Director of Real Estate Development <br />mi <br />U PCF UST -B- 112 Rcv. (12121107) <br />