Laserfiche WebLink
• <br />LVL' jr1V 1JJ <br />UNIFIED PROGRAM CONSOLIDATED FORM <br />UNDERGROUNDSTORAGETANK <br />MONITORING PLAN - Pae 1 of 2 <br />T1fPE OF ACTION 12f I. NEW PLAN [:12. CHANGE OF INFORMATION <br />PLAN TYPE 21 L MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4904 <br />(Cheek one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY TO # (Agency Use Only) <br />n. <br />BUSINESS NAME (Same as Facility Name or DBA) 3. <br />C05TCO Gasoline Loc. No. 38 <br />BUSINESS SITE ADDRESS toe. <br />1616 Hammer Lane <br />CITY Stockton Boa. <br />II. EQUIPMENT T19STING AND PREVENTIVE MAINTENANCE. <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g.. sensors, probes, line leak detectors, etc.) muse be performed at the frequency specified <br />bkr the equipmmt manufacturers' instructions, or mnualty, whi£hever is more fieguent Such work must be performed by g_ualified personnel. ( CCx 42612, 2634, 2633, zbn) <br />MONITORING EQUIPMENT IS SERVICED At least [RrLANNUALLY 99. OTHER (Specify): per Mfrs. IZlStrs.49eya. <br />490.3b. <br />- M. MONITORING LOCATIONS <br />1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED ID CCR §2632.26341 49M14' <br />W. TANK MONITORING IS PERFORMED USING_ THE FOLLOWING METHODS)that <br />apply) <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 4903. <br />WITH AUDIBLE AND VISUAL ALARMS. ID CCR §263x, 2634],,! <br />SECONDARY CONTAINMENT IS: ❑ & DRY e2 b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 4904, <br />PANEL MANUFACTURER: Veeder Root 490'2' MODEL#: TLS-35OR 49x3. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9 MODEL #(S): 794380-301 49aia <br />�( 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANKlS3. (23 MR §2643] 4s0-1 t. <br />PANEL MANUFACTURER: 490'31 MODEL #. 490'13. <br />IN -TANK PROBE MANUFACTURER: 490.14' MODEL #(S): 490-13. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAH.Y/NIGHTLY ❑ c. WEEKLY 49046. <br />❑ d. MONTHLY ❑ e.OTHER (Specify): 490'17. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. - ❑ b. 0.2 h. c.OTHER(S t ): 4-Wis. <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23_C_C_R§2646.11 49 20. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) ID ccR §264s1 TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS490-21. <br />❑ 5. TANK INTEGRITY TESTING PER ID CCR §2643.11 490-M. <br />TEST FREQUENCY:___ [I&ANNUALLY [Ib. BIENNIALLY [3c. OTHER(Specify): _°n E4' <br />�/- <br />99.OTHER (spcc]fy): Tank Probe VR -847390-109; Ball Float - 90g Capacity Fill Point <br />ei 492124:6. <br />V. PIPE MONITORING IS PERFORMED USING THE -FOLLOWING METHOD(S) <br />1. CONTINUOUS MONITORING OF PIPE/PIPING SUMPS) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE At VISUAL ALARMS. 490-23, <br />(21"§26361 SECONDARY CONTAINMENT IS: [Za. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM °90x9. <br />PANEL MANUFACTURER: Veeder Root 490'30. MODEL#: TLS -350R 490-31. <br />LEAK SENSOR MANUFACTURER: Veeder Root 49032. MODEL#(S): 490'33' <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. 91 a. YES ❑ b. NO 490'34' <br />FAH.URVDISCONNECIION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. �a. YES ❑ b. NO 490,15. <br />_ <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.6 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. TD CCR12636] <br />MLLD MANUFACTURER S: 490'37' MODEL#(S): 490'33• <br />tff-3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. ID CCR§26363 490x9. <br />ELLDMANUFACTURER(S): Veeder Root 49040. MODEL#(S): 848480-001 490x1. <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. 49042. <br />ELLD DETECTTON OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z.,/a. YES [-]b. NO 49aa3' <br />ELLD FAILUREMISCONNECTION TRIGGERSl3Ugo. PUMP SHUTDOWN. o. YES ❑ b. NO 49044. <br />..__-_ <br />❑ 4. PIPE AITEGRITY TESTING. ---------- <br />49045. <br />TBST FREQUENCY: [I a. ANNUALLY b. EVERY 3 YEARS.,.-, c OTHER S,cify). 190.°6. <br />- - -------------�------------------ <br />❑ 5. VISUAL PIPE MONITORING. 41043. <br />FREQUENCY: ❑ & DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATFD• 4-4. <br />---________,-_ _ _�_ •AVoxN fa m9eitai.3ofu.buie6 en..v9..r3.nmurlvel9l.ivanlr ar FL4C §33291.5(b�{ll _.,,-_. <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. ID CCR 9263y.x3)) 4W50. <br />❑ 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20. CHAPTER 6.715 CONNECTED TO THE TANK SYSTEM. s9o-si. <br />❑ 99.OTHER (Speci ) 49a53. <br />UPCF UST -D (12(2007) -1/4 _ w .apldocs.org <br />