My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:46 AM
Creation date
11/5/2018 11:18:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2013-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page 2 of 3 <br /> 1. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run#87 Piping Run# Piping Run# I Piping Run# <br /> Piping Material: Plastic <br /> Piping Manufacturer: Flex <br /> Piping Diameter: 2" FER 1.0 2014 <br /> Length of Piping Run: Approx 200' <br /> Product Stored: 87 prod <br /> Method and location of Test boot in sump <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 8:00am <br /> Initial Reading(R,): 5 psi <br /> Test End Time: 9:00am <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or 0,00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> 87 prod sec line—replaced boots in UDC 718, 9/10& 11112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.