Laserfiche WebLink
*IST SYSTEM RETROFIT OR REiGR <br /> (Submit minimum of 3 sets ofplans'&applications as originals will'be retained by EHD). <br /> 1._Site map enclosed?._ YES_[j NO[]. -- <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing..or•testing any component-that.is.repaired or,replaced, Ensure a copy of the!Site Health and Safety <br /> Plan..".Is.available.on the Jobsite.as,required by TIDe 8. ' <br /> 3. Detailed description of work'to be completed. List components to be repaired or replaced,and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done; (if <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> G&1." d-- <br /> J <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-partyapproval): <br /> 333-IddlVajig <br /> 3 <br /> ............... <br />