Laserfiche WebLink
Facility Name: Costco#038 Stockton (Page 4) <br /> I. Results of Vacuum/Pressure Monitoring Equipment Testing <br /> Manufacturer: Veeder-Root Model : 331117 System Type: ❑ Pressure ®Vacuum <br /> Sensor <br /> ID <br /> s1 Component(s) Monitored by this Sensor: Additive Product Line <br /> 11 Sensor Functionality Test Results: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass: ❑ Fail <br /> s2 Component(s) Monitored by this Sensor: Additive Vent Line <br /> 11 Sensor Functionality Test Results: ® Pass; ❑ Fail Interstitial Communication Test Result: ® Pass: ❑ Fail <br /> How was interstitial communication verified? <br /> ® Leak Introduced at Far End of Interstitial Space; ❑ Gauge; ❑ Visual Inspection; Other (Describe in l below) <br /> Vacuum was restored tooperating levels in all interstitials aces: ® Yes ❑ No (if no, describe in l below) <br /> J. Comments: <br />