Laserfiche WebLink
• RE1i� rC�1 P.O.Box 4208 <br /> Alitech !! VCflrJ17 0y�aa <br /> SWR bZ3 4�j06 <br /> MARY 7 2015 Phone:209-532-7320 <br /> Compliance without Compromise Fax:209-533-2650 <br /> [-NVIRONMENTAL mail@alltechpetro.com <br /> I?7A-T?J��oAi1TlAe�l? w .alltechpetro.com <br /> Spill Bucket Testing Report Form <br /> 1. FACILITY INFORMATION <br /> Facility Name: Costco#038 Stockton Date of Testing: March 5, 2015 <br /> Facility Address: 1616 Hammer Lane, Stockton CA <br /> Facility Contact: Rick Mederios Phone: 209-478-2040 <br /> Date Local Agency Was Notified of Testing : 2/20/15 <br /> Name of Local Agency Inspector (if present during testing): Fatinah Zareef <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Alltech Petro Inc, P.O. Box 4208, Sonora CA 95370. (209) 532-7320 <br /> Technician Conducting Test: Chad White <br /> Credentials ® CSLB Contractor M ICC Service Tech. ® SWRCB Tank Tester ❑ Other (Specify) <br /> License Number(s): CSLB CA 623541 A-HAZ, ICC 8152115-UT, SWRCB 09-1747 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br /> Test Equipment Used: 1-Hour Observed Test Equipment Resolution: 1/16 <br /> Identify Spill Bucket (By 1 87A Vapor 2 87B Vapor 3 91 Vapor 4 Additive Vapor <br /> Tank Number, Stored <br /> Product, etc.) <br /> Bucket Installation Type: El Direct Bury E] Direct Bury El Direct Bury El Direct Bury <br /> ® In Sump ® In Sump ® In Sump ® In Sum <br /> Wait time between <br /> applying vacuum/water 0 0 0 0 <br /> and start of test: <br /> Test Start Time(T,): 8:30 8:30 8:30 8:30 <br /> Initial Reading (R,): Top of Cap Top of Cap Top of Cap Top of Cap <br /> Test End Time (TF): 9:30 9:30 9:30 9:30 <br /> Final Reading (RF): Top of Cap Top of Cap Top of Cap Top of Cap <br /> Test Duration (TF—T,): 1.0 Hr. 1.0 Hr. 1.0 Hr. 1.0 Hr. <br /> Change in Reading (RF-R,): 0.0 0.0 0.0 0.0 <br /> Pass/Fail Threshold or 1/16" 1/16' 1/16' 1/16' <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ElFail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br /> tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> l hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date: 03/5/15 <br />