Laserfiche WebLink
Page 1 of 1 <br /> Garrett Backus [EH] <br /> From: Mary Young [myoung@wpinc.comj <br /> Sent: Monday, February 14, 2011 8:07 AM <br /> To; Garrett Backus [EHj <br /> Cc: Andy Lamas; Jason Smith; Ed Smith <br /> Subject: Costco 038 Stockton -SB989 Post Repair Testing Results 1/28/11 <br /> Attachments: COSTCO 038 SB989 1.28.11.pdf <br /> Good Morning Garrett, <br /> Attached please find the post repair compliance testing results conducted on 1/28/11 at the <br /> below station with components passing. Hard copies have been forwarded to you in the mail <br /> as well. <br /> Costco 038 <br /> 1616 East Hammer Lane <br /> Stockton, CA <br /> I have also added the 6 month post construction testing date of 8/1/11 to our schedule and will <br /> make notification to you/agency of our actual testing date when it gets closer. <br /> If there is anything further you may need at this time, please let me know. <br /> Thank you, <br /> Wary Young <br /> Wayne Perry, Inc. <br /> 8281 Commonwealth Avenue <br /> Buena Park, CA 90621 <br /> (714) 826-0352 <br /> myoung@wpinc.com <br /> 'Tor today, I wiff.." <br /> 2/14/2011 <br />