Laserfiche WebLink
r <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE I (One form per facility) <br /> no, <br /> "TYPE OF ACTION ❑ 1.NEW PLAN YJ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY IDN (AgenQ,Use OnW — <br /> Rn_. <br /> BUSINESS NAME(Same As FACILITY NAME) <br /> Costco Wholesale gas station #038 AN <br /> SS <br /> BUSINESS Sl FE ADDRER01 CITY <br /> Stockton <br /> 1616 Hammer Lane <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses un-u Mae releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. safety r If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary, y remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use.will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed ashazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed wntainer. Waste material shall be disposed <br /> appropriately. <br /> D Facility pcmonnet will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste defemination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors).it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> 'r We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material. other than the product/waste stored in the primary containment system, is placed inside s ccndary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and dean-up equipment kept permanently on-sits is listed in the facility's HazardMat <br /> ous erials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAILABLE FOR USE IF NEEDED: Com fete on1AVA1LAcabic) <br /> EQUIPMENT LOCATION VD BILITY wo. <br /> RIO <br /> R21. R31 <br /> R11. <br /> R_2. R3'. <br /> RI2. <br /> RD. RW. <br /> R13, <br /> R2+ R.a <br /> Rla. <br /> US <br /> RLS <br /> R15. <br /> IV. RESPONSIBLE PERSONS <br /> ]HE FOLLOWING PERSONIS)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: R50 <br /> RW TITLE Director of Gasoline Operations <br /> NAME Dwight Larsen <br /> 0.<I. <br /> R+fTITLE Compliance Manager <br /> NAME Dennis BockRS'_ <br /> Rae. TITLE <br /> NAME R53. <br /> R+3 TITLE <br /> NAME <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE.STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> PSAdditional system testing or data collection PS Inspection by qualified persons ❑Recalibrationofequipment <br /> Other: Rau. <br /> t'ST Response Plan(3/2008)-113 <br />