My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:19:03 AM
Creation date
11/5/2018 11:19:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2010-2012.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LVI:, H1V1JJ <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE OF ACTION L NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> 1. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) L <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Coscto Gasoline Loc. No. 38 <br /> BUSINESS SITE ADDRESS 103 <br /> 1616 Hammer Lane Grry Stockton � <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be Performed at the frequency specified <br /> by the equpment manufacturers'instructions or amually,wttichever is more frequent.Such work must.be perfotmed�quali lcd personnel Iz3 cca§?632,2634,2638,2641] <br /> �/ 490.3.. <br /> MONITORING EQUIPMENT IS SERVICED At least Lq I.ANNUALLY �r 99.OTHER(Specify): Per Mfrs . Instr8.490-36. <br /> IH. MONITORING LOCATIONS <br /> I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED (23 CCR 42632.26341 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Ch"k all <br /> that apply) <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 496-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§202,26M) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490.6. <br /> PANEL MANUFACTURER: Veeder Root 490.1. MODEL#: TLS-35OR 090$' <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490A. MODEL#(S): 794380-301 49040. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[n cca 420431 49o-u. <br /> PANEL MANUFACTURER: 49.12. MODEL#: 490'13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490.16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.19. <br /> 4918. <br /> _ __ PROGRAMMED TESTS: ❑ a.0.l�e_h: _ _❑ b.0.2 g.p.h. ❑ a.OTHER(Specify): _49 19,_ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[ntxal2 .0 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR 42645] TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49.23. <br /> K INTEGRITY TESTING PER I23 CCR 42643.11 49°'23. <br /> _ _TEST FREQUENCY:; y_ [;rit ANNUALLY�❑ b.BIENNIALLY ❑ c.OTHER(S e�cify)_ 49 24_ <br /> 99.OTHER(Specify): Tank Probe VR-847390-109; Ball Float - 901f Capacity Fill Point <9oi.z6. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (h l a`k ly) <br /> 56 I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-z0.. <br /> [g36M1 SECONDARY CONTAINMENT IS: 6r a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49.29. <br /> PANEL MANUFACTURER: Veeder Root 49.30. MODEL#: TLS-35OR 490.31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 49.32. MODEL#(S): 7943 _ 490.33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑ b.NO 490'34. <br /> ,./ <br /> FAILURE(DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [_I a YES ❑ b.NO 49.33. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.ph.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(z3 CCR42636] <br /> MLLD MANUFACTURER(S): 49.37. MODEL#(S): 49.38. <br /> __-_ _..- _. ._.. <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[D CCR426M] 490-39. <br /> HLLDMANUFACTURER(S): Veeder Root 49.x0. MODEL#(S): 848480-001 49.41' <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 4go'42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. Gr&YES ❑ b.NO 490'43. <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 9a.YES ❑ b.NO 49044 <br /> Is EINTEGRITY TESTING. ---_ _ _ <br /> ��tn��-��� 49043. <br /> -_,____ TEST FREQUENCY___ 56 NNUALLY b.EVERY 3 YEARS C.OTHER(S 1 )_ _49 7. <br /> - <br /> - �__ 0_ __ <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MM.MONTHLY&EACH TIME SYSTEM OPERATED- 49049. <br /> Allo for owoionaa of unbuded 4oarR4^9'_Vamtor fuel Y1252al.3rox3) _... <br /> ❑ 6.SUCTION PIPING MEETS_EXEMPTION CRITERIA.(23 CCR 42636(a)(3)) 49.1. <br /> ❑ 7.NO REGULATED PIPING PER HEALTHAND SAFP�TY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490x1. <br /> ❑ 99.OTHER(Specify) __ ----_ _ --___490.52. <br /> 49.53. <br /> UPCF UST-D(12/2007)-114 tvww.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.