My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO 2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:19:03 AM
Creation date
11/5/2018 11:19:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2010-2012.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OL Underwriters RECEIVID <br /> xxnbofon <br /> Mo <br /> Laboratories Inca333 Plingsten Pwd <br /> NOV 18 2010 NDr1A0raok,IL 60062.2096 USA <br /> www ul.cm <br /> lel:1 847 272 8800 <br /> ENVIRONMENTAL HEALTH lax:1 847 272 8129 <br /> PERMIT/SERVICES Customer setvke:I fin N43577 <br /> NOTICE OF AUTHORIZATION TO APPLY THE UL MARK <br /> 2005-03-07 <br /> Mr. Don Mukai <br /> S Bravo Systems Inc <br /> 2929 Vail Ave <br /> Commerce CA 90040 <br /> United States <br /> Fax number: 323-888-4123 <br /> E-mail: desian(&sbravo.com <br /> Reference: File MH 17263 Project 04NK21630 <br /> Products: USL—FIBERGLASS REINFORCED PLASTIC DISPENSER SUMPS AND TRANSITION <br /> SUMPS <br /> Dear Mr. Mukai, <br /> UL's investigation of your product has been completed under the above project number and the subject product <br /> was determined to comply with the applicable requirements. <br /> This letter temporarily supplements the UL Follow-Up Services Procedure and serves as authorization to apply <br /> the UL Listing Mark only at the factory under UL's Follow-Up Service Program to the subject products,which <br /> are constructed identically to the subject products,which were submitted to UL for this investigation.The UL <br /> Records covering the product will be in the Follow-Up Services Procedure, File MH17263,Volume 1. <br /> This authorization applies only to the address on this letter. <br /> This authorization is effective from the date of this Notice and only for products at the indicated manufacturing <br /> locations. Records in the Follow-Up Services Procedure covering the product are now being prepared and will <br /> be sent to the indicated manufacturing locations in the near future. Please note that Follow-Up Services <br /> Procedures are sent to the manufacturers only unless the Applicant specifically requests this document. <br /> Products that bear the UL Mark shall be identical to those that were evaluated by UL and found to comply with <br /> UL's requirements. If changes in construction are discovered, appropriate action will be taken for products not <br /> in conformance with UL's requirements and continued use of the UL Mark may be withdrawn. <br /> Sincerely, Reviewed by: <br /> Tim Crews Wayne B. Doversberger <br /> Staff Engineer Staff Engineer <br /> Hazardous Locations,Gas&Oil Hazardous Locations,Gas&Oil <br /> Tel: 847-664-2516 E-mail:wayne.b.doversberger@us.ul.com <br /> Fax: 847-313-2516 <br /> E-mail: timothy.a.crews@us.ul.com <br /> An to UeDende, t n,gan,:atiun walking Ia' a Sale' V'Q"d Will' '"100111Y.Y. Dleuisiou and kna WleU qe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.