Laserfiche WebLink
Facility Name: Costco # 038 Stockton (Page 2) <br /> D. 'Results of Testing/Servicing <br /> Com tete the followin checklist: <br /> Software Version Installed: 328.03 <br /> PEYes ❑ No* Is the audible alarm o erational? <br /> No* Is the visual alarm o erational) <br /> ❑ No* Is the nr function o erational? <br /> No* Were all sensors visual) ins ected, functional) tested, and con❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other <br /> e ui ment will not interfere with their ro er o eration? <br /> No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. <br /> ❑ N/A modem) operational? <br /> No* For or <br /> piping systems, does the turbine automatically shut down if the piping secondary <br /> ❑ N/A containment monitoring system detects a leak, fails to operate, or is electrically disconnected? If <br /> yes: which sensors initiate positive shutdown? (Check all that apply) ® Sump Sensors; <br /> Dispenser Containment Sensors. <br /> Did you confirm positive shutdown due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br /> ®Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device, is <br /> ❑N/A the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? At <br /> what percent of tank capacity does the alarm trigger? 90% <br /> ❑Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other <br /> equipment replaced and list the manufacturer name and model for all replacement parts in Section <br /> E, below. <br /> ❑Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check a// <br /> that apply)❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br /> ®Yes No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if <br /> a2elicable <br /> ®Yes ❑ No* Is all monitoring equipment oerational per manufacturer's s ecifications? <br /> 1. Comments: The jumpers on the flex lines in dispensers: 1/2, 3/4, 5/6 and 7/8 were all still connected for <br /> the secondary lines. Jumpers were disconnected and pointed down per Inspector's request. This avoids a <br /> write up by the Inspector and return visit. Problem was fixed onsite with no write up. No Deficiencies. The <br /> facility is in compliance with regard to this section. <br />