My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 11:13:49 AM
Creation date
11/5/2018 11:20:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\1630\PR0518624\COMPLIANCE INFO 2016-PRESENT .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Name: Costco # 038 Stockton (Page 3) <br /> In-Tank Gauging: <br /> ®Check this box if tank gauging is used only for inventory control and disregard the following section. <br /> Complete the following checklist: <br /> ®Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ®Yes ❑ No* I Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> klzYesrON Was accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> ®Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑ N/A performance? (Check all that app/y) Simulated leak rate: ® 3 gph.; ❑ 0.1 gph ; ❑ 0.2 <br /> h. <br /> ®Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ®Yes ❑ No Was the testing apparatus properly calibrated? <br /> ®Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> F-1N/A <br /> ®Yes ❑ No For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A is disabled or disconnected? <br /> ®Yes ❑ No For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ®Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.