Laserfiche WebLink
• 6. PIPING SUMP TESTING • l" �� �` <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional ES�4el 4 20 <br /> ❑ Other(Spect&) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic ` IIS ` <br /> ❑Other(Specify) <br /> Test Equipment Used: Incon TS-STS Sump Test system Equipment Resolution: +/-0.002" <br /> _ 87 Tl 87 T2 91 Vent Box <br /> Sump Diameter: 48" 48" 48" 241'x20" <br /> Sump Depth: 67" 67" 67" 32" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 281, 23" 23" 16" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 23" 12" 12" N/A <br /> Condition of sump prior to testing: Good Good Good Good <br /> Portion of Sump Tested' 4"Above Pen. 4"Above Pen. 4"Above Pen. 4" Above Pen. <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No ®NA ❑Yes❑No ®NA ❑ Yes❑No®NA ❑ Yes❑No ®NA <br /> product and water)?` <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is systemtdown7�stem programmed for fail-safe <br /> shu ❑Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No®NA ❑Yes❑No ®NA <br /> Was fail-safe verified to be <br /> operational?* ElYes❑No ®NA ❑Yes❑ No ®NA ❑Yes❑No®NA ❑ Yes❑No ®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 07:54 AM 07:54 AM 08:33 AM 07:54 AM <br /> Initial Reading(RI): 2.0447 3.2194 3.5331 6.1928 <br /> Test End Time: 08:09 AM - 08:09 AM 08:48 AM 08:09 AM <br /> Final Reading(RF): 2.0446 3.219E3.53j3 6.193 <br /> Test Duration: 15 min. 15 min. mn. 15 min.Change in Reading(RF-Ri): -0.0001 -0.0004001 0.0002Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002 .002 +/-0.002Test Result: Pass Passss Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes YesYes Yes <br /> verified functional after testing? <br /> _Comments—(include information on repairs mode prior to testing and reconmten ded follow-ap orfailed tests) <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment Testing scope of work. <br /> If the entire depth of Ute sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />