My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3003
>
2300 - Underground Storage Tank Program
>
PR0503426
>
REMOVAL_1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 12:11:22 PM
Creation date
11/5/2018 11:22:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1992
RECORD_ID
PR0503426
PE
2381
FACILITY_ID
FA0004400
FACILITY_NAME
STOCKTON STEEL CO
STREET_NUMBER
3003
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618002
CURRENT_STATUS
02
SITE_LOCATION
3003 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3003\PR0503426\REMOVAL 1992.PDF
QuestysFileName
REMOVAL 1992
QuestysRecordDate
5/9/2013 8:00:00 AM
QuestysRecordID
163675
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK P�9MOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tants invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted <br /> within five (5) working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PTT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPL FS <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank FID OR Pump End of Tank <br /> 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCURE <br /> ElPIPING SOIL SAMPLES I Sample every 20 lineal feet <br /> TANK& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> # (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br /> order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK I TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL.SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 047 (Revised 7/10/92) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.