Laserfiche WebLink
V <br /> CALIFORNIA HEALTH AND SAFETY CODE DIVISION 20 <br /> CHAPTER 6.7 <br /> SECTION 25299 <br /> (a) Any operator of an underground tank system shall be liable for a civil penalty of not less than <br /> five hundred dollars ($500) or more than five thousand dollars ($5,000) for each <br /> underground storage tank for each day of violation for any of he following violations: <br /> (1) Operating an underground tank system which has not been issued a permit, in <br /> violation of this chapter. <br /> (2) Violation of any of the applicable requirements of the permit issued for the operation <br /> of the underground tank system. <br /> (3) Failure to maintain records, as required by this chapter. <br /> (4) Failure to report an unauthorized release, as required by Sections 25294 and 25295. <br /> (5) Failure to properly close an underground tank system, as required by Section 25298. <br /> (6) Violation of any applicable requirement of this chapter or any requirement of this <br /> chapter or any regulation adopted by the board pursuant to Section 25299.3. <br /> (7) Failure to permit inspection or to perform any monitoring, testing, or reporting <br /> required pursuant to Section 25288 or 25289. <br /> (8) Making any false statement, representation, or certification in any application, record, <br /> or other document submitted or required to be maintained pursuant to this chapter. <br /> (b) Any owner of an underground tank system shall be liable for a civil penalty of not less than <br /> five hundred dollars ($500) or more than five thousand dollars ($5,000) per day for each <br /> underground storage tank, for each day of violation, for any of the following violations: <br /> (1) Failure to obtain a permit as specified by this chapter. <br /> (2) Failure to repair or upgrade an underground tank system in accordance with this <br /> chapter. <br /> (3) Abandonment or improper closure of any underground tank system subject to this <br /> chapter. <br /> (4) Knowing failure to take reasonable and necessary steps to assure compliance with this <br /> chapter by the operator of an underground tank system. <br /> (5) Violation of any applicable requirement of the permit issued for operation of the <br /> underground tank system. <br />