Laserfiche WebLink
Q 5`1 3, 99 12:04 FAX 425 251 8782 B3RGHAUSEN zuua <br /> .MAY 13 ' 99 11 : 13 FROM GE' 2-RYAN INC TO 142525 2 PAGE -003/005 <br /> Site Safety Plan <br /> Job #1112.01 <br /> HAZARD EVALUATION: <br /> PARAMETER: TLV: 300 ppm THC <br /> HEALTH: Ingestion, inhalation, absorption <br /> LEL: 10% Gastechtor max. <br /> SPECIAL PRECAUTIONS <br /> AND COMMENTS: Correct safety procedures must be followed, per Gettler- <br /> Ryan Inc. Health and Safety Plan. Use 30 lbs./1 ,000 <br /> gallon capacity dry ice to inert tanks. USA # <br /> ,,$jg SAFETY WORKPLAN: <br /> PERIMETER <br /> ESTABLISHMENT: Mini-Mart to remain open during construction. Use <br /> barricades and flagging to restrict access to tank removal <br /> areas and other work zones as necessary. <br /> PERSONAL PROTECTION: Level of Protection: EPA Level D <br /> Modifications: Hard hats required at all times, orange <br /> vests, safety glasses, hearing protection as needed. <br /> Surveillance Equipment and Material: Gastech <br /> SITE ENTRY PROCEDURES: All visitors to site must wear same PPE as required of <br /> Getter-Ryan Inc., personnel. <br /> DECONTAMINATION <br /> PROCEDURES: Personnel: Wash thoroughly with detergent solution and <br /> water. <br /> Equipment: Steam Clean if necessary. <br /> FIRST AID: As applicable. <br /> WORK LIMITATIONS: (Time of day, weather, heat/cold stress): None, <br /> PROJECT-DERIVED <br /> MATERIAL DISPOSAL: Recycle materials to maximum extent possible. Tanks, <br /> lines and rinsates to be disposed of by ECI/Errickson. All <br /> materials removed will be placed on visqueen, sampled <br /> and classified for proper disposal. <br />