My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995 PIPING REMOVAL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3518
>
2300 - Underground Storage Tank Program
>
PR0232337
>
REMOVAL_1995 PIPING REMOVAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 4:53:50 PM
Creation date
11/5/2018 11:33:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995 PIPING REMOVAL
RECORD_ID
PR0232337
PE
2361
FACILITY_ID
FA0003599
FACILITY_NAME
ARCO AM PM #5569
STREET_NUMBER
3518
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
13002001
CURRENT_STATUS
02
SITE_LOCATION
3518 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HAMMER\3518\PR0232337\PIPING REMOVAL 1995.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h. The field supervisor is Personnel may <br /> change depending on field conditions. Changes will be <br /> noted in the field log book. <br /> Employee Training Assignments <br /> All on-site employees will be trained in accordance with T8 CCR <br /> 5192 (e) . The person serving as Site Safety and Health Supervisor <br /> will have completed a standard first aid course. <br /> 4 . HAZARDS <br /> Identified Physical Hazards <br /> The presence of heavy equipment at this site presents the potential <br /> for physical injury during the permanent closure. All heavy <br /> equipment operators and workers around the equipment must be <br /> constantly aware of the hazards associated with the operation of <br /> that equipment. The following precautions will be taken during any <br /> construction activity to prevent physical harm: <br /> 1. All heavy equipment at the site (backhoes, front-end <br /> loaders, utility trucks, etc. ) must be used only for the <br /> purposes for which it was designed. Under no <br /> circumstances will a piece of heavy equipment be used for <br /> personnel lifts. <br /> 2 . All vehicles with a haulage capacity of 2-1/2 cubic yards <br /> or more must be equipped with an automatic electric back- <br /> up alarm which is audible at a distance of 200 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.