Laserfiche WebLink
El GROUNDWATER <br /> [:1-1H Consulting <br /> Consulting Groundwater Geologists 9 11 O <br /> A Division of Oil Recovery Systems, Inc. <br /> 5047 CLAYTON ROAD•CONCORD,CA 94521•(415)671-2387 <br /> JAN 3 '19db <br /> January 2, 1986 ENVIROMENTAL HEALTH <br /> FERMIT/SERVICES <br /> San Joaquin Local Health District <br /> 1601 East Hazelton Avenue <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> Dear Sirs, <br /> Enclosed please find Groundwater Technology' s application <br /> for a permit to drill 5 monitoring wells at the Exxon Service <br /> Station on Hammer Lane and Sacramento Road. <br /> Exxon Company, U.S.A. retained Groundwater Technology on <br /> December 17, 1985 to install these wells to investigate the <br /> potential impact of a line leak of at the station. The proposed <br /> locations for the wells are drafted on the enclosed rough site <br /> map. A final site map has not yet been drafted. <br /> The certificate of insurance and release form are forthcoming <br /> from Alexander & Alexander Insurance Company and Exxon Company, <br /> U.S.A. , respectively. The tentative drilling dates have been <br /> rescheduled for January 8-10, 1986. <br /> Sincerely, <br /> =ern?t"O� <br /> GGroundwate Tehnology <br /> Geologist II <br /> AS:kmh <br /> Enclosure <br />