Laserfiche WebLink
02-18-1999 08:52PM FROM TO 14252518782 P.08 <br />1 <br />TEM ORA IING NFORHAT$WI <br />c tete sets of plans (include aanffacturcrls specification sheets for proposed equiPment to be installed). <br />Thee omp, <br />Pl lens drawn ro scale in neon -erasable print. <br />I I <br />.Plat plan �o show location of tanks and all associated piping. <br />/I 1 <br />�✓ rotectors itlustrated belou all accessible openings - <br />Striker pt�ates or drop cube -ma atted bottom p <br />Tank eros §ectiopal diagram. <br />j� oe ail ofItacik, associated piping, excavation and cover_ <br />It testing organization- CTitte Z3, Chapter <br />_ <br />To,,k(s) ar?d Piping approved b5' a nationally recognized independep <br />/ Ar icL a 3; Section 2631 (b) b Zfi35] <br />V I Verification of product compatibility with the tank(s), Piping, monitoring <br />�ice(s) epoxy or silicone glues, etc- <br />Ifacturer's written installation instructions for tank(s), piping, mwitoring devices, etc, <br />At the (n: taltacion site, prior Instatlati <br />ins. ti tst on 2635 <a) s test s�haLt be & (4j� on both primary (1°) and <br />$ ondaryi(Z') containment systems <br />Tank integrity test required upon completion of installation with tank in operating condi Cion. fest results to be <br />Submitted directly to PHS -END from the corrins company or owner of facility. [Health b Safety code, Division 20, <br />C> apter 61,.7, Section 25291 (h)I <br />r/tnNK <br />TmcrSITIOl1 <br />r BE Ind TUI C 7?'f <S /V&-1 <br />lsteel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metaliic exterior <br />,coatings or coverings. <br />(1) Tested at the installation site Using an electric resistance holiday detector. <br />(2) vacuum applied to interstitial space. <br />'Fiberglass <br />(1) Installation instructions require an air test and soap bubblee <br />test prior to installation. <br />}< (2) vacuum applied to interstitial space - <br />(3) Hydrostatic annular <primary tank pressure test) - <br />Non -clad steel tank [section 2635 (a) (2) (A)] <br />ji <br />(1) cathodic protection provided for entire tank, piping and components (ruts, bolts, washers, <br />OTC.). <br />_ (2) Field installed carhodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />9 <br />s 3 <br />CITY <br />JFACTURtR <br />PassTlo <br />EL <br />fid l�h/' <br />� die �G✓ <br />DUCT <br />RASION <br />LISTS <br />ROTE <br />TION <br />7 <br />Q <br />ee-r`°`�� <br />p <br />PATIBILITY <br />HANOL f <br />WITH <br />100% <br />Y <br />7 E S <br />r BE Ind TUI C 7?'f <S /V&-1 <br />lsteel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metaliic exterior <br />,coatings or coverings. <br />(1) Tested at the installation site Using an electric resistance holiday detector. <br />(2) vacuum applied to interstitial space. <br />'Fiberglass <br />(1) Installation instructions require an air test and soap bubblee <br />test prior to installation. <br />}< (2) vacuum applied to interstitial space - <br />(3) Hydrostatic annular <primary tank pressure test) - <br />Non -clad steel tank [section 2635 (a) (2) (A)] <br />ji <br />(1) cathodic protection provided for entire tank, piping and components (ruts, bolts, washers, <br />OTC.). <br />_ (2) Field installed carhodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />9 <br />