My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 • 09:2?• FAX 425 251 8782 BARGRAUSEti <br />'99 15:1,0 FROM GETTLER-RYAN . <br />Z009 <br />TO 14252518782 'E.004/OOT <br />SMITH FIBERGLASS PRODUCTS INC. _ <br />2700 WEST 6STREET. LITTLE ROCK. AR 72209-9592.501.558-4010 • FAX 501-568-4db5 <br />5TH <br />A SUBBOIARY OF A. O. &MfTH CORPORATION <br />CERTIFICATION OF ATTENDANCE GE ; <br />This is to certify that in May 10, 1996 the following employee(s) <br />3f Gettler-Ryan Inc. attended a seminar detailing the proper <br />5rocedures to be used when installing Smith Fiberglass Products' <br />JL/ULC listed fiberglass piping systems for use in conveying <br />•setroleum products, alcohols, and alcohol -gasoline mixtures <br />.inderground . <br />The piping installation procedures taught were directly in accor- <br />lance with the following Smith Fiberglass Products instruction <br />manuals. <br />1. Manual B2160 - General Installation Instructions <br />for UL Listed RED THREAD® IIA <br />Pipe and Fittings and RED THREAD IIA <br />Secondary Containment Fittings <br />2. Bulletin F6600 - Assembly and Operating Instructions <br />for 1"-6" Field Tapering Tool <br />3. Bulletin F6625 - Operating Instructions for Model 2100 <br />or Model 2100-1 Power Tool <br />-One copy of this certification listing the participant(s) is <br />-provided for your files. Please distribute the card to the <br />attendee. The personnel attending were as follows: <br />Jack <br />Roman <br />Scott Moore <br />James <br />Reed <br />Mike,Giretto <br />Will <br />Bowen <br />Vic Nunes <br />Ryan <br />Wright <br />George DeJesus <br />Dennis Gan <br />Gary Standish <br />Phil <br />Wright <br />Barry McCoy <br />0_l�,Ic <br />Execul iee-resident, Sales <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.