My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o.5 _o- 99 14: 59 F..�T 425 251 878: BARGHAUSEN <br />0d/26/1999 07:11 7146705420 EH'S ARCO La PALMA <br />MONITORING AND RESPONSE PLAN - Y <br />ARCO M)DUCTS CQMPALa KACMgay ySrl-l-u <br />ECONDARY CONTATUNNMI11T Ox' <br />SURNTERSTBLE PU AP SHTjTDf�Wi+1 <br />_7 <br />ARCO :°achy• 4932 _ Address: 16 EastHardihg. Way <br />Jtocktan, CA 95204 <br />C'C9) 90(a— 951& <br />�Zn19-o29 <br />PgGE F76 <br />_Crds pian is designed -to meet the monitoring and response requirements o Section 2532, Article 3, <br />rtle 23, CCR_ <br />1_MONITORING EOUI HENT <br />1 <br />Secondarily contained storage taakcz and ;fines at this facility are monitored by a contiriuou�: <br />electre:>:c leak det: cLon system which consists of an alarm panel, sensors and associated <br />electronic,;. Liquid sensors are installed in the annular space of each double wall tank and <br />product line pipIng sump. w';tenever a sensor detects the presence of a liquid there is both a <br />visual and audible alarm at the control panel. In addition, the continuous Mouitor on the <br />product piping system will shut down the pump and activate the alarm system w"1011 ,; <br />release is detected or if 'he continuous product piping moritonng sy; = fails or is <br />disconnected, the pumping system will shut down_ <br />Automatic line leak detectors are i :stake,-', oa *�'ze secondzrily coIItained prossurized product <br />piping. The line lPe k detector will detect a loss of pressure in we product !inns and restrict <br />the flow of-rcduct. <br />2• 24,614, _A I NAPd4E SCAEDJ-LE OF MOMTORjNqEQUI-pMENT <br />fine continuct:s electronic leak detection system including line leak detectors `wrill be <br />inspected according to the manufacturer's instructions by an outside contactor once daritag <br />each calendar year. <br />3. ROUTINE M0N_fTQQ [ATG PROCEDURE <br />On it daily basis the facility operator shall- <br />, <br />A. Inspect tl-Ze control panel for visual and audible alarru signais to confirm chat <br />The unit iS operating. <br />B. Inspect island and tank fill areas for signs of spillage or petroleum sheen- <br />
The URL can be used to link to this page
Your browser does not support the video tag.