Laserfiche WebLink
04/26/1999 07:11 7146705420 EHS ARCO LA PALMA PAGE 13 <br />�-: <br />ARCO Facility: <br />MONITORING AND RESPONSE PL_N_SC <br />ARCO PRODUCTS COMPANY FACILITY WITH <br />DISPENSER $PILL CONTAINMENT DEVICES <br />Address: <br />This is a monitoring and response plan of action for facilities with spill <br />containment devicea installed beneath the dispensers. <br />1. CONTAINMENT EQUIPMENT <br />Dispenser spill containment devices [box(es)] are located beneath <br />each dispenser to contain any leaks from components and fittings <br />inside the dispenser cabinet, A mechanical sensor is located in the <br />box. When the sensor detects the presence of a liquid, it will activate <br />the impact valve and shut the dispenser down. <br />2. MAINTENANCE SCHEDULE <br />The containment devices will be inspected according to the <br />manufacturer's instructions by an outside contractor once during each <br />calendar year. <br />3. ROUTINE IVIONITORIN6 PROCEDURE <br />On a weekiy basis the facility operator shall: <br />A. Inspect each _containment box for the presence of a liquid. <br />B. Remove debris from the containment box, <br />If any liquid is found, manually close the Impact valve, place the <br />dispenser "out of service", and call ARCO Maintenance immediately. <br />4. RESPQNSE PRQCEDURE - CONTAINMENT t30XES r <br />OPERATOR RESPONSIBILITIES <br />In the event the impact valve is activated and shuts down a <br />dispenser, station personnel immediately: <br />