My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,041/2,6/1599 07:11 7146705420 EHS ARCO LA PALMA PAGE 1 <br />ARCO PRODUCTS COMPANY FACILITY WITH <br />DISPENSER $PILL CONTAIN ENT DEVICES <br />ARCO Facility: Address: <br />This is a monitoring and response plan of action for facilities with spill <br />containment device6 installed beneath the dispensers. <br />1 . CONTAINMENT EQUIPMENT <br />Dispenser spill containment devices [box(es)] are located beneath <br />each dispenser to contain any leaks from components and fittings <br />inside the dispenser cabinet. A mechanical sensor is located in the <br />box. When the sensor detects the presence of a liquid, it will activate <br />the impact valve and shut the dispenser down. <br />2. MAINT91YANrE SCHEDULE <br />The containment devices will be inspected according to the <br />manufacturer's instructions by an outside contractor once during each <br />calendar year. <br />On a weekly basis the facility operator shall: <br />A. Inspect each containment box for the presence of a liquid. <br />B. Remove debris from the containment box. - <br />If any liquid is found, manually close the in -pact valve, place the <br />dispenser "out of service"; and call ARCO Maintenance immediately. <br />4. RE PNSE PR E --,Cg)NTAINMENT 13QXES f <br />OPERATOR RESPONSIBILITIES <br />In the event the impact valve is activated and shuts down a <br />dispenser, station personnel immediately: <br />
The URL can be used to link to this page
Your browser does not support the video tag.