My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> 08/04-,99 15:58 FAX 425 251 8782 BARGHAUSEN 14013 <br /> b4/Lb/17�Jy n/;11 /146795426 EHS ARCO LA PALMA <br /> PAGE 14 <br /> A. Contact ARCO Maintenance or its designated agent by using <br /> the telephone number previously <br /> provided— <br /> S. <br /> rovidedS. Tag the dispenser "out of order" until the liquid has been <br /> removed by authorized persons. <br /> ARCO RESPONSIBIUVIES <br /> Method of removing an unauthorized release from the spill <br /> containment device: <br /> A. Any unauthorized release.into the containment box will be <br /> removed by ARCO in accordance with California Health and <br /> Safety Code requirements. In the event of an emergency, a <br /> pumping contractor or truck will be available Immediately_ in <br /> all other cases, equipment availability will be within 12 hours. <br /> B. ARCO Maintenance will be responsible for authorizing and <br /> selecting contraetQts for the work to be performed. <br /> 5. TRAINING <br /> All-employees must be trained In the a subject mentioned In Sections 3 <br /> and 4 above. Training needed for the operation of the dispenser <br /> containment devices shall include how to inspect the equipment and <br /> to manually close *he dispenser impact valve. <br /> r- <br />
The URL can be used to link to this page
Your browser does not support the video tag.