My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
2300 - Underground Storage Tank Program
>
PR0231136
>
INSTALL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 11:50:32 AM
Creation date
11/5/2018 11:39:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231136
PE
2361
FACILITY_ID
FA0003610
FACILITY_NAME
A&A GAS & FOOD MART
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/26/1999 07:11 <br />7146705420 <br />EHS ARCO LA PALMA <br />MONITORING AND RESPONSE PLAN X <br />.ARCO PRODUCTS COMPANY FACILITY WITH <br />SECONDARY CONTA MENT OF <br />UNDERGROUND STORAGE TANKS & PRODUCT LINES WITH <br />SUBMERSIBEE PUMP SHUTDOWN <br />ARCO Facility: 4932 Address: XGEast Harding We <br />Stockton, CA 95204 <br />PAGE 06 <br />This plan is designedto meet the monitoring and response requirements of Section 2632, Article 3, <br />Title 23, CCR. <br />1. MONITOP NG EQUIPMENT <br />Secondarily contained storage tanks and lines at this facility are monitored by a contilluous <br />electronic leak detection system' which consists of an alarm panel, sensors and associated <br />electronics. Liquid sensors are installed in the annular space of eachdouble wall tank and <br />product line piping sump. Whenever a sensor detects the presence of a liquid there is both a <br />visual and audible alarm 'at the control panel. In addition, the continuous monitor on the <br />product piping system will shut down the pump and activate the alarm system when a <br />release is detected or if the continuous product piping monitoring system fails or is <br />disconnected, the pumping system will shut down. <br />Automatic line leak detectors are installed on the secondarily contained pressurized product <br />piping. The line leak detector will detect a loss of pressure in the product lines and restrict <br />the flow of product. <br />2. MAINTENANCE SCHEDULE OF MONITORING EQUIPMENT <br />The continuous - electronic leak detection system including line leak detectors will be <br />inspected according to the manufacturer's instructions by an outside contractor once durit1g <br />each calendar year. <br />3. ROUTINE MONITORING PROCEDURE <br />On a daily basis the facility operator shall: <br />A. Inspect the control panel for visual and audible alarm signals to con.fxrn-i that <br />the unit is operating. <br />B. Inspect'i.5land and tank fill areas for signs of spillage or petroleum sheen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.