Laserfiche WebLink
EMERGENCY RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name CHEROKEE MEMORIAL PARK <br /> Facility Address Hwy 99 @ Harney Lane. PO Box 1000. Indi_ CA 95241-1000 <br /> 1. If an unauthorized release occurs, how will the hazardous substance be cleaned up? <br /> Note: If released hazardous substances reach the environment, increase-the fire or <br /> explosion hazard, are not cleaned up from the secondary containment within S hours, <br /> or deteriorate the secondary containment, then San Joaquin County Environmental <br /> Health Division must be notified within 24 hours: <br /> Jim Thorpe Oil Inc Emergency response contractor 209/368-6175 <br /> 2. Describe the proposed methods and equipment to be used for removing and properly <br /> dispposing of any hazardous substances: <br /> All spills will be contained with the use of dikes constructed of absorbant <br /> material - If nprPccary, sand will ha trurkpd in to he ncari for rnntainment. <br /> Free liquids will be removed from collection areas. All residuals willbe <br /> disposed of by whatever means is appropriate under the proper manifestation. <br /> 3. Describe the location and availability of the required cleanup equipment in item 2 <br /> above: <br /> Ahcnrhant matarialc lnratad in the maintAnanra chnn <br /> 4. Describe the maintenance schedule for the cleanup equippment* <br /> Absorbant material requires no maintenance. It is readily available <br /> always Jim Thorpe Oil Inc would have any additional e iinmant nsad <br /> 5. List the name(s) and title(s) of the person(s) responsible for authorizing any work <br /> necessary under the response plan: <br /> J. Charles Irwin President <br /> Marc Gabrys Grounds & landscape architect <br /> Richard Hanson, Grounds manager <br />