My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2300 - Underground Storage Tank Program
>
PR0231849
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 4:37:26 PM
Creation date
11/5/2018 11:44:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0231849
PE
2361
FACILITY_ID
FA0003762
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
02
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BECKMAN\200\PR0231849\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g, a Describe the method that will be atllixed to purge and'or inert tae=nlgsr <br /> Dry ice will be added to the tank(s) at the rat <br /> er ga ons ca acit for die and <br /> per 1000 gallons capacity for gasoline tanks . <br /> tt Taabmping Hauler. <br /> Name Jim Thorpe Oil , Inc. <br /> Address P.O. Box 357 Clt9 r cr1; Y f ap_gS2�1-9357 <br /> Phone No209� 368-6175 _ <br /> SaWerReglOAUcn#(lthauledatha=rdous) 2667 <br /> a TanklPlplag Disposal Site: <br /> 6000 & 7500 gal tanrks �o:WEST COAST EQUIPMENT, P. 0. Box 2368, Turlock, CA 95381 <br /> Address 1221 S. Tegner Road mtq -Turlor-k„ CL. 953 . __ <br /> ne90 209 668-9378 <br /> 1000 gal tank to: 209 68-6175 1 o age <br /> EPA wo(if trahaported to a permitted TSD TacDttl� <br /> The piping will go to: Schnitzer Steel Products , 12000 Folsom Blvd Rancho Cordova, CA 95742 <br /> 9. Is The sampling firm an independent t1drd part'from the contractor? YES IT xd)J (916) 985-4810 <br /> 9a. Describe,In detail•how the$Oil andlorwatet asmple(s)beneath the tank and piping will be obtained: <br /> Samples will be taken from native soil at least 2 to 3 feet <br /> under the .former tank location with the harkhoe. Samples will taken <br /> from Zhe tg(,, - c)P nr -Pr Wate nam , if napded will be <br /> taken with a bailer. <br /> 10. Deaeribe how me exeavedoa w1 be bacUlled Willi suitable material upon retno4al: <br /> Backfill of the excavation(s) will done at the appropriate time <br /> durina this proiect . Backfill material will consist of the <br /> excavated material and other suitable clean compactable material. <br /> 11- Handling of excavated MD: <br /> a)%bit material will be used to line the tank pit and cover the stcdgpileT <br /> 6 mil plastic sheeting. <br /> b)11W wm be the final destination of the excavated ateokpile4 <br /> Depending upon the contaminate , levels of said contamination <br /> an quantities o soil , the soi wi 1 be treate on site or hauled <br /> c)Contaminated Soil HarmrdomWaste Hader. to a suitable landfill . <br /> Sam Jim Thorpe Oil , Inc. Hauler He oranond 2667 <br /> Address P.O. Box 357 _City Lodi , CA an 95241-0357 <br /> PhoneNo.(_20_9 368-6175 <br /> Ell 23 D46Itsvised MUM) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.