My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2300 - Underground Storage Tank Program
>
PR0231849
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 4:37:26 PM
Creation date
11/5/2018 11:44:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0231849
PE
2361
FACILITY_ID
FA0003762
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
02
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BECKMAN\200\PR0231849\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1r' ti' <br /> 7759 South Airport Way San Joaquin County <br /> Stockton,CA 95206-3918 <br /> Telephone(209)982-4675 Mosquito & Vector <br /> Facsimile(209)982-0120 Control District <br /> Email sjcmvcd@woddnet.att.net <br /> Memo <br /> To: Michelle Stemi-Le, EHS,SJC-PHS <br /> From: John R.Stroh, Manager <br /> CC: Eddie Lucchesi,Asst. Mgr. <br /> Date: July 17,2001 <br /> Re: 200 N. Beckman Rd. Lodi UST removal project <br /> The San Joaquin County Mosquito and Vector Control District(District)has determined that the three <br /> (3)UST's at 200 N. Beckman Rd., Lodi are to be abandoned and removed during the second quarter <br /> of FY 2001-2002. <br /> The Districts Board of Trustees(Board)authorized the solicitation of bids for the project at their June <br /> 2001 meeting. Project announcements and bid sheets were sent to eight local contractor/vendors,with <br /> instructions to return their bids for review and consideration by the Board at their meeting on <br /> September 17,2001. <br /> It is assumed that if a contractor were selected,the project would start within 30 days and finish within <br /> 90 days of awarding the bid. <br /> Please do not hesitate to contact me at 982-4675 if you have any questions or need additional <br /> information. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.