Laserfiche WebLink
XI -3 <br />XII -1-e. on completing installation work. the General Contractor <br />will type Circuit Identification cards for lighting, heating, <br />XII -3 <br />AJI piping, fittings, valves, etc., shall be furnished and <br />ventilation, airconditioning, refrigeration and fast food <br />equipment circuits and attach some in space provided on panel. <br />XI13-o. AJI yon d wiring will be done in conduit, minimum 3/4' and <br />installed as necessary to provide a complete installation as <br />This process also includes the final hook-up and start up of <br />except in storage room, and except wher* indicated as exposed on <br />'panel <br />shown on drawings. All work and material shall be in strict <br />the Modular building delivered to project site by Fabricator. <br />plans. All drops to switches. receptacles. boxes, etc., <br />with local and state codes and ordinances. <br />AM circuits will be chocked and properly identified at project <br />on walls will be in wire mold. All other wiring will be exposed <br />site by General Contractor. <br />on sides of beams, walls, or ceiling, and done in a neat and <br />XI -3-a. Gasoline Piping: See Section XV and Tank Installation <br />orderly workmanlike manner. Underground conduit and conduit <br />Drawings. <br />X11, 1-f. All wall switches outlets will be mounted 4'-6" above <br />that is installed in an area up to a level of eighteen (24 <br />finish floor except where designated otherwise. All duplex <br />inches above the floor will be rigid, heavy wall galvanized <br />XI -3-b, I All special gasoline fittings, fill boxes, valves, etc., <br />outlets will be mounted a min. of (24") above finish floor. <br />conduit. All OXP03ed conduit above the 24' level will be wire <br />shall be furnished and installed by the Contractor unless <br />mold which will be U.L. approved. Carefully ream out the inside <br />noted on equipment list to be supplied by others. Approval <br />of all conduit after cutting. <br />as to type and rnonuftun e shall k obtoinet! from the <br />X11-1-9. Flexible cords may not be used: <br />re installation is de. <br />Owner's Representotive befomo <br />XII -3-b. Run separate underground conduit and it to floodlights, <br />I As a substitute for fixed wiring. <br />signs, control to pumps, island lights, etc. as shown on <br />XI -3-c. Fuel Oil and Drain Oil Piping: Fuel oil and drain oil <br />2 Where run through holes in walls, ceilings, or floors. <br />general layout can equipment list. Conduit should be heavy <br />piping shall also include all necessary connections and <br />3 Where attached to building surfaces, <br />walled galvanized conduit. 3/4' minimum. Pumps will be wired <br />fittings within the buildings, except that fuel oil lines <br />according to C1033-1. Group -D, National Electric Code. Do oil <br />shall be terminated and copped 12' above the floor and <br />Xll- I -h. Flexible cords must be-, <br />required trenching and backfill to minimum depth of 2'-0* below <br />shall be connected from this point to the oil burner by <br />finished grades.- an will be used to backfill in a -sufficient <br />the heoting contractor. See Section IX -5. <br />1) Continuous lengths without splices or to <br />quantity to completely encose the conduit in 6" of sand. <br />2 Fastened so that there is no pull on joints or screws. <br />Remainder of backfill will be son d or well tamped clean earth <br />xi -3-d. Air Piping and Tank: Install oil air piping as shown on <br />3 Replaced when frayed or insulation deteriorated. <br />free from cinders and decomposed mutter. <br />drawings and connect to oil necessary equipment. All <br />4 Equipment connected by flexible cords must be grounded <br />above ground piping shall be standard galvanized iron and <br />either by a 3 -wire cord or by a separate groundwire. <br />XII -3-c. Conductors will be a minimum of Number 12,' insulated, <br />fittings shall be galvanized malleable iron. Quick <br />copper, type THWN. Size to be determined by ollowable <br />couplers shall be ARO 1210 or approved equal. <br />voltage drop as determined in Article 210-6(d) of National <br />Electric Code. <br />XI -3-e. Lubrication Tubing: Furnish and install steel tubing and <br />X11 -11-i. Exposed noncurrent -carrying metal ports of fixed equipment <br />fittings for lubrication equipment when indicated on <br />that may become energized under abnormal conditions must <br />XII -3-d. Submerged gasoline pumps will be wired to Class -1, GroupD <br />drawings and/or attached Equipment Gist® <br />be grounded: <br />of the National Electric Code and in accordance with pump <br />manufacturer's specifications. <br />XI -3-f. List Installation-. Before installation the lift shall be <br />1 In wet or damp locations. <br />thoroughly inspected for any dornoge with particular <br />2 When in electrical contact with metal. <br />XII -3-e. Contractors will use on approved thread compound on all <br />attention being poid to the outside cylinder wall. Do -not <br />3 When operated in excess of 150 -volts to ground. <br />conduit joints..', Thread of buried or outdoor conduit will <br />'make-up <br />install lift it any dent is found in cylinder wall but <br />be cooted,, ' 4fter with Glyrtol or other corrosion <br />nt <br />notify Owner's Representative who will make arrangemes <br />X11- I -j. Exposed noncurrent- carrying metal parts of cord and plug <br />preventative material. Electrical conduit possing within <br />for the necessary corrective measures. After lift is <br />connected equipment, which are liable to become energized, <br />twenty feei',*`,f',,, gasoline dispensers or ten feet of any tank <br />installed and superstructure assembled, it will be filled <br />must be grounded. <br />fill pipe will be sealed at both ends. <br />with SAC 110 weight oil and bleed in accordance with <br />manu(octurer's recommendations. The piston shall be raised <br />XII -1-k. Wherever wires are joined, such as at outlets, switches, <br />XII -4 <br />M&LLRLAL� <br />to its maximum height and with oil air manifold valves <br />junction boxes. etc., they must be covered. <br />left in ttwir open position, the air control valve will <br />XII -4-o. Refer to Equipment List and Addenda to Specifications to <br />be secured in its neutral position. The piston shall be <br />XII -11-1. Parts of electrical equipment which in ordinary operation <br />determine number, type and monufacturer'of lighting fix <br />allowed to remain in its raised position fora period of <br />produce carts, sparks, etc® must be enclosed unless they <br />tures and who is to furnish. <br />not less than 24-hourti. It any perceptible lowering of <br />are separated and isolated from oil combustible material <br />the piston is apparent, or if any loss of pressure is <br />and well outside the parameters of a designated hazardous <br />Plots for wall switches will be Harvey Hubbell Catalog <br />indicated on the gouge, the entire system must be <br />area. <br />No._93070 (or equol) series. Wall receptacles will be <br />inspected and the leak eliminated, <br />20 -amp. duplex grounding type with Harvey Hubbell Catalog <br />XII -11-m. A switch or circuit breaker in a wet location or outside <br />No. 93102 Plates® Weatherproof receptacles will be <br />of a building must be enclosed in a weatherproof <br />20-omp. duplex grounding type with Harvey Hubbell Catalog <br />x1l <br />enclosure. Circuit exposed to a wet environment will be <br />No._5206 cover plated - oropproved equal. AJI outside <br />(Modular Buildings - by Fabricator} <br />connected to a ground fault breaker. <br />fittings and fittings in modular buildings to wall <br />(C -Stores & C -Store Conversions - by General Contractor) <br />, <br />receptacles will be weatherproof. <br />XII -1-n. In damp or wet locations, cabinets and cutout boxes of <br />the surface type must be weatherproof and so placed or <br />All it old to be pointed to match finish of surface it <br />equipped as to prevent moisture or water from entering and <br />is mounted on. <br />X11- I <br />accumulating within the cabinet or cutout box, and be <br />mounted so there is at least 1/4 -inch of air space between <br />ranel board to be circuit breaker type with door, minimum <br />Unless otherwise noted on 'Equipment List', furnish all labor, <br />the enclosure and the wall or other supporting surface. <br />42 circuits as manufactured by Squore-D, Westinghouse. <br />material and equipment necessary for the complete installation <br />It is recommended that boxes of nonconductive material be <br />General Electric or approved equal. Refer to building <br />of all yord,, cortopy lights anti d power wiring, tele phom service <br />Used with nonmetallic-sheothed cable. <br />design electrical drawings and specifications for details <br />and driveway signal conduit, including oil the required <br />regarding power panels and circuit information. <br />conduit, wire fittings, etc., as herein specified and indicated <br />XII -11-o. Electrical pumps, tools, etc., even "explosion -proof,: <br />on the Electrical and General Layout Plans. <br />must be avoided wherever possible in hazardous areas. A <br />XII -5 <br />situation which is hazardous is defined as one in which <br />XII -11-o. All work must be done in strict accordance with the <br />oxygen concentration is greater than 25 -percent. or <br />national electric code and local codes, ordinances. etc. <br />flammability characteristics are greater than 20 - percent <br />XII -5-o. Telephone service will enter rear of building via under <br />Any additional costs resulting from any deviation from the <br />of lower flammable limit. Other drive systems: e.g., air, <br />ground conduit from service to building. Electrical <br />drawings and these specifications due to codes or local <br />should be used. <br />Contractor will provide conduit and service cop for <br />requirements shall be borne by the responsible Contractor. <br />telephone service as indicated on drawing and/or called <br />To General Contractor give oil requisite notices and pay <br />XII-1-p.Where explosion -proof electrical equipment must be used, <br />for in Addenda to Specifications and required by the <br />for oil nec633ory licenses, permits and any other fees <br />regular inspection and testing to verify explosion -proof <br />Telephone Company: Cover plate(s) shall be Harvey Hubbell <br />required for the electrical installation, Contro�tor will <br />integrity to oil components must be carried out. <br />Catalog No. 93181. or approved equal. <br />includ* in his price all required wiring for hazardous <br />areas. <br />Portable lamps must be equipped with handle, lampholder. <br />hook and substantial guard attached to the lompoll er or <br />X111 <br />XII -1--b. All electrical materials and fixtures must or the <br />handle. All exterior surfaces which might come in con <br />(By General Contractor) <br />underwriter labels and on completion, o certificate of <br />tact with battery terminals, wiring terminals, or other <br />inspection acceptable to the National Board of Underwriters <br />objects must be of nonconducting material or must be <br />X111- I <br />will be furnished the owner by General Contractor. <br />effectively protected with insulation. Lompholders must <br />be of unswitched type, and must not provide means for <br />General Contractor will provide new connections to water main, <br />XII -1-c. Fabricator to furnish mason with sleeves for walls cat <br />plug-in of attachment plugs. Outer shell must be of <br />sewer lines and gas service, unless otherwise noted on Plot <br />all locotions where work would otherwise mor finished sur <br />moulded composition or other material approved for the <br />Plan or Addenda. Contractor will obtain all permits, pay all <br />faces and give instructions for accurate location of the <br />purpose, and metol -shell, lined lampholders. either of <br />fees and perform the connections in strict accordance with <br />sleeves, other openings. etc. Note particularly the <br />switched or unswitched type, must not be used. alocal <br />codes, ordinances and regulations, All Utility <br />location of circuit breaker panel, so that panel conduit <br />Connections is the 'direct responsibility of the General <br />running to it may be concealed in sleeves. <br />XII -2 <br />Contractor. <br />X11 -1-d. Provide and make temporary connections to required <br />See Plot Plan and/or Addenda to Specifications for type of <br />XII12 <br />equipment at existing facilities when a rebuild project occurs <br />service required and/or available. 120/240 -volt, 3-phose, <br />in a manner which will cause (lie least interference erence with <br />60 -cycle is minimum and will enter rear of building in under <br />General Contractor will install new water supply from water <br />business operations. Cost of temporary service to be paid <br />ground metal conduit unless otherwise noted on Plot Plan of <br />main to meter in accordance with local regulations. No <br />by General Contractor. The General Contractor to provideI <br />Addenda to Specifications. If overhead service is specified it <br />existing water connection will be used unless specified in <br />necessary temporary service to facilitate construction <br />will hove a minimum clearance of W-15" over paved areas and <br />Addenda. New water supply line for other facilities will be <br />whether project is rebuild or new. <br />will not as over any building, All wire used on project to <br />not less than., 1-1/2" soft tempered copper Type -"K". <br />be copper. AJI electrical service installation to meet the <br />National Electric Code as well as the local utility service <br />furnishing power, <br />3 <br />Exposed water line will be Type 'L" hurd tempered copper, <br />General Contractor will install and poy for the water meter and <br />send receipted invoice to Owner's Representative. If meter <br />cannot be purchased and must be leased, Contractor will make <br />deposit at his cost in Owner's name, submitting the receipted <br />invoice to the representative, together with complete <br />information concerning terms of lease. <br />Water manifold VOIV03 when required will be Powell #1821. gate <br />valves, or approved equal and appropriately marked as Service <br />Room", 'Drinking Fountain', etc. <br />New sewer will be 6" clay tile sewer pipe from city sewer to <br />within 5'-0" of building, Balance of pipe will be 4- standard <br />cost iron pipe with traps, vents, clean -outs, etc., ns required <br />by local ordinonce or as shown on drawings. If permitted by <br />local codes PVC pipe and fittings may be substituted for the <br />above when installed in accordance with manufacturer's instruc <br />tions. Make tile pipe joints with cement mortar and cost iron <br />pipe joints with ookum and molten lead, firmly tamped and gas <br />tight. Pitch pipts to remain clean of sediment. Connect <br />restroom drains to sanitary sewers. If restroorn drain <br />connections ore not permitted to either sanitary or storm sewer, <br />provide a dry well of required size (See Addenda) or other <br />suitable method of disposal. Provide cleonouts at base of all <br />risers. at changes of directions, etc. Cleanouts will have <br />flush brass deck plates. <br />XIII-4PT T <br />I <br />Where sewers ore not available, General Contractor will <br />provide a complete septic system as shown on plot plan and in <br />occordonce with local and state building code, regulations, etc. <br />XIII -5 AAT <br />T.E-ALLL <br />MW <br />When public water supply is not available this work will <br />include the furnishing and installing of pur-aping equipment, <br />controls and piping as shown or specified herein*, it will also <br />include furnishing working and shop drawing, testing, arid <br />operation services. <br />Toe General Contractor will obtain all permits and comply with <br />all state and local requirements for the construction of a <br />single cased well using 4" ASTM Spec, A-53 schedule 40 pipe. <br />Well casing to be axe urn 3' below finished grode with on 18" <br />die. manhole frome and cover. Screen will be of Everdur metal <br />of continuous 'It' slot or louvre construction, Slot Area will <br />be selected by Contractor to conform with water -bearing stratum <br />encountered. Assume 150 -foot depth. The Contractor will <br />furnish and install a Redo 3/4 -hp submersible single phase pump <br />or turbine well pumping unit, electrically driven, to rated <br />cop:city of well. All electrical connections, including those <br />to power limes® motors and controls, and the setting of <br />controls will be mode by others. <br />The Contractor will fumish and install all water and drain <br />age piping and valves as shown. All piping and valves will <br />conform with applicable portions or specifications for "Water <br />Distribution System." A hot dipped golvonized or glass lined, <br />galvanized pressure tank at not less than 120 gallon capacity <br />will be installed in storeroom, <br />The General Contractor will guarantee (hot the water producti <br />as shown by official test is not a temporary condition, and if <br />at any time during a period a( one year from date of test, <br />production falls below test, General Contractor will reinstate <br />the wells capacity at not cost to the owner. I <br />When required by Addenda to these Specifications or indicated <br />on Plot Pion, General Contractor will install supply line frorn <br />closet service connection to rear of building. Size of line to <br />be determined by local regulotion:s and demand factor. All work <br />to be done in conformance with local codes, utility <br />requirements ond NFPA latest edition. See Section IX -5 (or <br />piping specifications. <br />r_�Oil \14� �5EWYMIN �iOLT'PRNE & LN-17'Ef�5T/Vi-E' 6 <br />STOCK -T-01\1) CAL�F_ORNIA <br />UT <br />SHELL IL COMPANY <br />HOUSTON, TEXAS <br />- " - I 1_\ <br />GCNERAL SPEC, I I ATIOINS <br />RETAIL FACILITIES <br />SHEET if 4 <br />SCAU CIK 0/APV 0 <br />PA D <br />DvK ty A. RINCON <br />6f(Alli ly J,1. IRYUN-DR 90058 <br />