My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2300 - Underground Storage Tank Program
>
PR0231883
>
REMOVAL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:52 AM
Creation date
11/5/2018 11:59:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2004
RECORD_ID
PR0231883
PE
2351
FACILITY_ID
FA0002111
FACILITY_NAME
BEN HOLT SHELL
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
02
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BENJAMIN HOLT\3011\PR0231883\REMOVAL 2004.pdf
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMP►—.G PROTOCOL FOR ROUTINE TANK REM,,_ ALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be representative <br /> of native soils beneath the tank's invert(tank's bottom)at a collection depth not to exceed 2-4 feet. If contamination is documented <br /> during closure,an Unauthorized Release Notification must be completed and submitted within five(5)working days pursuant to <br /> California Health&Safety Code,Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000- 10,000 2 per Tank I at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> TANK& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER <br /> # (Gallons) of SOIL SAMPLES SAMPLES of WATER SAMPLES <br /> < 10,000 2 from wall next to tank <br /> Single Tank 3 ends at soil/groundwater 1 <br /> interface& I below tank <br /> 4 from wall next to tank <br /> > 10,000 OR ends at soillgroundwater <br /> Tank Cluster 5 or more interface& 1 below each 1 <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> EH 23 046(Revised 10/16/03) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.