Laserfiche WebLink
Jul-08-04 10:00am F.am-C9ttler-Ryas Inc +335 551 7888 T-6T0 P-003/007 F-666 <br /> Site Safety Plan <br /> .lob #52278.1 <br /> SPECIAL PRECAUTIONS <br /> AND COMMENTS: Correct safety procedures must be followed, per Gettler-Ryan <br /> Inc. Health and Safety Plan. Tanks to be triple rinsed by ECI <br /> Environmental. Tanks to be inerted with 30 lbs per 1000 <br /> gallon capacity, dry ice. <br /> SITE SAFETY WORKPLAN: <br /> PERIMETER <br /> ESTABLISHMENT: Site to be fenced while under construction. Use barricades <br /> and flagging to restrict access as necessary. <br /> PERSONAL PROTECTION: Level of Protection: EPA Level D <br /> Modifications: Rubber gloves, hard hats, orange vests. <br /> Surveillance Equipment and Material: Gastech <br /> SITE ENTRY PROCEDURES: Insure all visitors to site wear same PPE as employees. <br /> DECONTAMINATION <br /> PROCEDURES: Personnel: Wash thoroughly with detergent solution and <br /> water. <br /> Equipment: Steam Clean if necessary. <br /> FIRST AID: As applicable. <br /> WORK LIMITATIONS: (Time of day, weather, heat/cold stress): None. <br /> PROJECT-DERIVED <br /> MATERIAL DISPOSAL: Recycle materials as much as possible. Soils to be stockpiled <br /> on site and sampled for proper disposal or reuse. Rinsate, <br /> tanks and lines to be disposed of by ECI. <br />