My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BOURBON
>
1413
>
2300 - Underground Storage Tank Program
>
PR0231869
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:55 AM
Creation date
11/5/2018 12:13:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0231869
PE
2361
FACILITY_ID
FA0003958
FACILITY_NAME
AT&T California - UE694
STREET_NUMBER
1413
STREET_NAME
BOURBON
STREET_TYPE
St
City
Stockton
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
1413 Bourbon St
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOURBON\1413\PR0231869\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC I-sp.EALTH SERVI,�ES op44!ry, <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> Cq `P <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> APPLICATION FOR PERMIT TO CLOSE <br /> UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br /> / 1. GENERAL INSTRUCTIONS: <br /> [l} 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned <br /> to the applicant with comments. <br /> f/ 2. Include a detailed site map on a separate sheet of paper. showing the location of the tanks(s), piping. <br /> streets, adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water <br /> wells, buildings, underground public utility lines (including water, sanitary sewer and storm sewer), and <br /> distance of piping from tank to dispensers. If underground utilities are not included on the site map. you <br /> must state in writing that USA Dig will be contacted prior to excavation activities. <br /> [ j 3. Complete page 3. "Application for Underground Storage Tank Clos re Permit". . ote!: Samoling <br /> / firm shall be an independent third party from the contractor. 'yLXo_� ��C �� yJ�01A_e� <br /> [t j" 4. Complete page 9. "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> 5. Submit the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br /> / Worksheet". <br /> 6. Complete all questions on page 10, the Public Health Services-Environmental Health Division (PHS- <br /> EHD) "Underground Storage Tank Disposition Tracking Record", except those requiring a signature <br /> and date of tank removal. The holder of the permit shall be responsible for ensuring that this form is <br /> completed and returned to PHS-EHD within 30 days of the tank removal. <br /> [l/ 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential <br /> hazards for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> [%,Kl 8. If facility is located outside of the city, limits, submit a "Backfill Excavation Certificate" as required by <br /> the County .of San Joaquin Building Department and the incorporated City Building Departments. <br /> pursuant to the Uniform Building Code STD 70-11. <br /> NA9. Obtain a "Grading and Excavation Permit" from the Cin• of Tracy Buildin-g Division prior to PHS- <br /> EHD approval of the closure plan. <br /> [ 1=10 <br /> 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequateh <br /> completed plan. If gross deficiencies are identified, an addendum will be required with a S78.00'hou7 <br /> fee and the review will begin on the date of resubmittal. <br /> Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br /> Advance inspectioc notice of at least 48 hours i5 reouired b% PHS EHD <br /> Submit Contingence Plan for over-excavation at time of UST removal (if planning to over-excavate). <br /> See "III. SITE MITIGATION" on Page Z. <br /> EH 23 046 (Revised 08'13'99) Page 1 <br /> A Division of Sart Joaquin Count% Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.