Laserfiche WebLink
OR RESPONSIBILITY CONTAINED THEREIN FOR LACK OF FENCING. PCO CONFINED <br />SPACE OR DEEP EXCAVATIONS ARE EXPECTED. SOIL SAMPLING IS COMPLETED <br />WITH MECHANICAL EQUIPMENT. NO SITE PERSONNEL ARE ALLOWED IN ANY <br />EXCAVATIONS FOUR FEET OR DEEPER. THESE EXCAVATIONS MUST BE SHORED, <br />BRACED OR SPECIAL EXCAVATION PROCEDURES FOLLOWED ACCORDING TO OSHA AND <br />CAL OSHA, <br />3.0 ESTIMATES OF HEALTH HAZARDS <br />OVER THE COUNTER MEDICINES CONTAIN HIGHER LEVELS OF, AS AN EXAMPLE, <br />PHENOL AND METHYLENE CHLORIDE THAN THOSE EXOECTED FROM JOB ACTIVITIES <br />OR SOIL CONTAMINATES FOUND IN ORGANICS AT ANY JOB SITE ( CAMPHO-PHENIQUE <br />SOLD OVER THE COUNTER: 30,000 MG/L OF PHENOL; THROAT LOZENGES SOLD OVER <br />THE COUNTER: 5,000 MG/KG METHYLENE CHLORIDE ). ANY EXPECTED HAZARDOUS <br />CONTAMINATES HAVE DETECTABLE ODORS ABOVE ZOO MG/KG, FALCON ENERGY HAS <br />AND USES A FLAMMABLE GAS DETECTOR, <br />WHEN LIQUIDS OR STRONG ODORS ARE ENCOUNTERED, ALL WORK SHOULD <br />CEASE AND OSHA PEL's WILL NOT BE EXCEEDED. % VAPOR HAZARDS REQUIRING <br />RESPIRATORS SHOULD OCCUR. <br />THE HAZARD OF CONTAMINATED DUST IS NOT NEGLIBLE. PARTICULATE DUST <br />FILTERS ARE ALWAYS PROVIDED ALL SITE EQUIPMENT OPERATORS. JOB SITE <br />SUPERVISOR ALWAYS HAS AUTHORITY TO DISCONTINUE OPERATIONS IN THE CASE <br />OF EXCESSIVE DUST, PROTECTIVE CLOTHING TO AVOID SKIN CONTACT IS REQUIRED. <br />EYE, HEAD AND SAFETY SHOE PROTECTION IS REQUIRED. <br />4.0 ORGANIZATION AND RESPONSIBILITIES <br />4.1 PROJECT MANAGER <br />THE FALCON ENERGY ENVIRONMENTAL MANAGER IS SPECIFICALLY RESPONSIBLE, <br />OR HIS DESIGNEE, FOR ALL ASPECTS OF DAILY OPERATIONS AND EACH SPECIFIC <br />SITE OPERATION REGARDING TANK REMOVALS. THE ENVIRONMENTAL MANAGER IS <br />RESPONSIBLE FOR THE PROJECT THROUGH ITS SUCCESSFUL COMPLETION. ANY <br />DESIGNEE SHALL REPORT DIRECTLY TO THE ENVIRONMENTAL MANAGER. <br />4.2 THE SITE HEALTH AND SAFETY OFFICER <br />