My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 9:02:51 AM
Creation date
11/5/2018 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BUCKLEY COVE\4950\PR0231028\BILLING 1987 - 2005.PDF
QuestysFileName
BILLING 1987 - 2005
QuestysRecordDate
12/11/2017 11:11:29 PM
QuestysRecordID
3745759
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R EG D <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK JAN 1 b 213MONITORING PLAN — Pae I of 2) <br /> TYPE OF ACTION ❑ 1 NEW PLAN ❑ 2.CHANGE OF INFORMATION SAN JOAQUIN COUNTY <br /> PLAN TYPE 1,I MONITORING IS IDENTICAL FOR ALL USTs A THIS FACILITY <br /> (Check one irem onlr) Q2,THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(Sy HEALTH DEPARTMENT <br /> I. FACILITY INFORMATION <br /> FACILITY ID tt(Agena•Use Oehl 1 <br /> FA - vvo - 38 <br /> BUSINESS NAME(Same as F"cilin'Vnnie OBAI <br /> ✓ O / ��YR <br /> BIiSIN�(E�SS SITE.AppDD���RESS �/l�-� -� 1"3 CITY n� <br /> T�� vNL�L ✓dM177 l'✓ SSI <br /> II. QUIPMENT ESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency specified <br /> br the eyuipmem manufacturers'instructions,or annually,whichever is more frequent Such worA must be performed by qualified personnel.Iv CCa 3xrn±an 2r,3x.2a+n <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLY 99.OTHERS cit' <br /> ❑ ( Pe Y)� Jw�Se <br /> IH. MONITORING LOCATIONS <br /> ❑ 1 NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 9 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED <br /> S ''J CCR§Y.312634 <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) rea(ak <br /> JR I CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) +•""` <br /> WITH AUDIBLE AND VISUAL ALARMS.R3 CCR 3210.±6341 <br /> SECONDARY CONTAINMENT IS a. DRY Q ❑ c.PRESSURIZED ❑ d.UNDER VACUUM J•""' <br /> �' ❑ b LI UID FILLED <br /> PANEL MANUFACTURER- 1�ov A'N J•"" MODEL G: XTLS <br /> 4•""' <br /> LEAK SENSOR MANUFACTURER. 2xrAli 4•NL° MODEL N(S): �j J•"`I" <br /> ❑ 2 AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGL F WALL TANK(S).123 cca 32(431 <br /> PANEL MANUFACTURERJ•"`I'- MODEL H: Jw''11 <br /> IN-TANK PROBE MANUFACTURER. J•"'"IJ MODEL A(S): J•"'" <br /> LEAK TEST FREQUENCY. ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLYax"m <br /> ❑ c.WEEKLY <br /> ❑ d MONTHLY ❑ c OTHER(Speeify): DNi11 <br /> PROGRAMMED TESTS. 0 a.0.1 g.p.]I ❑ b.0_ • h. <br /> _ ...._... 'S P ❑ c.OTHER(Specify): J•n�-o, <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION DCCR§2(1,11 <br /> _ 21 <br /> ❑ 1.WEEKLY MANUAL TANG GAUGING(MTG)I23 CCR 32rwl TESTING PERIOD: ❑ a.36 HOURS Elb.60 HOURS Jx,22 <br /> ❑ i TANK INTEGRITY TESTING PER 123 CCR 42(43 If - - - +•+l--i <br /> TEST FREQUENCY. ❑ a.ANNUALLY [I ❑ cOTHER <br /> b.BIENNIALLY (S d'px y): +•A"x <br /> . 4•A"2s <br /> ❑ 99. <br /> OTHER(Specify). _ - - - v4:ri$r <br /> J•A"21 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "Check"/( <br /> rharapply) <br /> I� I CONTINUOUS MONITORING OF PIPE/PIPING SUM PIS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS 2x <br /> I,ax SCCONDARY CONTAINMENT IS: a DRY +•""=° <br /> )$' ❑ b LIQUIDFILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER 94 9" +•"6311 MODEL p: X <br /> LEAK SENSOR MANUFACTURER: 4"`322 MODEL k(S) L37 +•x433 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP I,e.'TURBINE)SHUTDOWN ❑ a.YES ❑ b.NO J•"i" <br /> FAILURE/DISCONNECTION OF THE MONffORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑ b.NO 4•""3s <br /> �'_. MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 30 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED I23CC1L316361 <br /> MLLD MANLJFACTURER(S). f�i QIw" 4,37 <br /> MODEL k(S): `717P114 SrrMw <br /> ❑ 3 ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.133 CCR321•36I J•""3' <br /> ELLD MANUFACTURER(S): 4`"1-"' MODEL k(S): Jw"I <br /> PROGRAMMED IN LINE LEAK TEST. g p ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> ❑ a.MINIMUM MONTHLY 02 h <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO J•"13 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ &YES ❑ b.NO 4•"1J4 <br /> X4.PIPE INTEGRITYTESTING - - .._ -+•""+s <br /> TEST FREQUENCY. Oa.ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER(Specify) �+4•r a�Jr• <br /> ❑ i VISUAL PIPE MONITORING. �,O +•M4+" <br /> FREQUENCY ❑ a.DAILY ❑ b WEEKLY ❑ c.MIN MONTHLY&EACH TIME SYSTEM O <br /> •n1lor.eJr i ny of b xe emerya,Mr_kmv vor Fuel ppnaoN±W HSC bX31 <br /> ❑ 6 SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR 421311,111 <br /> ❑ 7 NO REGULATED PIPING PER HEALTH AND SAFETY CODE.DIVISION 20.CHAPTER6.7 IS CONNECTED TO THE TANK SYSTE� _ 44-51 <br /> ❑ 99.OTHER(Specify) <br /> J $± <br /> 4•x"3, <br /> L'PCF CST-D(12/2007)-114 www.unidms.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.