Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Checkall <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING ® 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC Si-AND-ALONE +wu+a <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) .1-54 <br /> LEAK MONITOR MANUFACTURER: 4x`S5 MODEL M: 4'11fi <br /> LEAK SENSOR MANUFACTURER: J1.F59 MODEL q(S) J'x45x: <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ® b NO 4'41-S9 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ® b.NO +w'{" <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ® b.NO 4'xxet <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO <br /> UDC CONSTRUCTION IS IN I SINGLE WALL ❑ 2.DOUBLE WALL Jwu° <br /> IF DOUBLE WALL: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY. ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO Jww.w <br /> VII. PERIODIC SYSTEM TESTING <br /> I. ELD TESTING'. THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 41xl.6e <br /> L TE N E D MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MON ITIS AS REQUIRED 123 CCR 42i u it <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. +ww� <br /> ® 3. SPILL BUCKETS ARE TESTED ANNUALLY. 4-AW <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: +wl.nx <br /> E a-ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c,l"ANK INTEGRITY TESTING RESULTS <br /> ❑ if SIR TESTING RESULTS(and supporting documentation records) ❑ c.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. +'nw'x <br /> REFERENCE DOCUMENTS MAINI AINED AT FACILITY/Checkall dust apply/ <br /> E THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) +'xveh <br /> E OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Requiredi Jaw'x <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4.Wki <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 494",< <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION'. "HANDBOOK FOR TANK OWNERS - MANUAL AND 4w4sur <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS- <br /> OTHER(Specify): <br /> YSTEMS"OTHER(Specify): wtifwi <br /> 4AM% <br /> This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council +'xwm <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> 'r Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> i The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan <br /> > Name(s)of contact persons)for emergencies and monitoring alarms <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indica ges with addition lormation on specific monitoring procedures are attached to this plan. 4.1-710 1 te how many pa °IS CLAP. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: I the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by th_splan occurs.2.)all conditions that indicate a possible release are investigated,and 3.1 all monitoring records are matntatnedproperly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONI"PORING AND EQUIPMENT MAINTENANCE: <br /> NAME: 4AIlliji J'm-n_ -11'fLE I44yL6@2 P40"TEft J-xl.n <br /> NAME: u — TITLE: SST. M Ai rJ JxlaS <br /> The Designated UST Operator shall perform a monthly visual Inspection of the facility.provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-tiaction. <br /> I . OPERATOR SIGNATURE <br /> CERTIFICATION:I certify at th nfor o ov ded herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE,. +wr-rr <br /> REPRESENTING. LTanA Oumr/O rotor 2 FaiI1M1'Owner/O asali6of Orcn +11X146 <br /> APPLICANT NAME(print) Jwlax APPLICANTTITLE', AM1-7' <br /> A/oeE,J &,-fa M++srF <br /> UPCF UST-D(12/2007)-314 www.unidocs.org <br />