Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE 1 one fn m facHit ) <br /> TYPE OF ACTION ❑ I.NEW PLAN ❑ 2.CHANGE OF INFORMA"TION Rol <br /> I. FACILITY INFORMATION <br /> FACILITY ID= (Agency Use Only) <br /> BU ESS NAME(Same as FACILITY NAME) t <br /> , , C e :.x A A e5elr <br /> BUSIPIESSSITE A DRESL 49S Ina BUSINESS SITE CITY Iw, <br /> 501 ve— a 5-%-Vc Fi <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> > If sale to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove 5 <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will he pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,mumble or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> > Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed a;hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to stone water systems. <br /> Y We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC(MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete o/di,il'applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. R20. R10. <br /> t <br /> all R_'1. <br /> R12 U2. <br /> RIS. R13. R13, <br /> RIJ. R''-J. R11. <br /> RI5_ R'S Rli. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSONS)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> .VAN Rin. TITLE ,t— IQ% <br /> NA , Ral. TITLE RI. <br /> NAME o Rd', TITLE R^-- <br /> NAME Rai TITLE Ro <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORI7_ED REJ.EASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> 01. ADDITIONAL SYS r Ent TESTING OR DATA COLLECTION INSPECTIONBYQUALIFIED PERSONS ❑3. RECALIBRATION OF EQUIPMENT Rba. <br /> ❑09. OTHER(Speeiy): R6L <br /> UN-022B-1/3 www.unid"s.org Rev.04/02/08 <br />