Laserfiche WebLink
V STATE OFCAUFORNIA 1-/ <br /> STATE WATER RESOURCES CONTROL BOARD i`�•c' •.'c�+ <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. In o <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT CP�5 CHANGE OF INFORMATION ❑ 7 PE OSED ON <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ e O D. <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: t <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK 1.0.N l� B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) J D. TANK CAPACITY IN GALLONS: <br /> If.TANK CONTENTS IF A-1 IS MARKED.COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C, 1a REGULAR UNLEADED n`�j 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ W EMPTY 1 PRODUCT 1D PREMIUM UNLEADED u 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 9S UNKNOWN ❑ 2 WASTE ❑ 1e MIDGRADE UNLEADED 5 JET FUEL ❑ 8 M85 <br /> ❑ 2 LEADED 99 OTHER(DESCRIBE N ITEM D.BELOW) <br /> D. IF A.1)IS NOT MARKED. ENTER NAME OF SUBSTANCE STORED C.A S.0: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A B,AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> S. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 F18ERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER UNED ❑ 2 ALKYD LINING ❑ 3 EPDXY UNING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL,aLC. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE VES_ NO_ STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U I SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> S. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 UNED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U I BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑1 Mlaw UMI Ue ❑2 UTE tgmx¢ss ❑3 wanaTwus WrERsnnAl 4[LEcmoNc uaE s AumMATk ww <br /> OflFGfOR TESIMG T DRWI ❑ TEAR lIE1EC10R 1:19MLUWN E:) 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 <br /> MONITORING EUALINVENTORY ❑ 3 ZE ❑ 4 AUTOMATIC TANK ❑ 5 GROUNDTER ❑ 6 ANNUAL TANK <br /> E] 7INTERSTITIAL ❑ qLIAlION VATORING AUCNGTESTING <br /> 8 <br /> SIR ❑ 9 WEEKLY MANUAL ❑ 10 MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> TANK GA GING TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN.PLACE) <br /> I.ESTIMATED DATE LAST USED(MO/DAY/YR) 2 ESTIMATED OUANTTTY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 8 SIONATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW d <br /> COUNTY N JURISDICTION k FACILITY k TANK N <br /> STATE I.D:# ml <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> I ! <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PI '.E THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE I- GROUND STORAGE TANK REGULATIOT{; I b <br /> FORM 8 (696) `I ' /,S 1 <br />